My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One Broadway Plaza Findings and Facts in Support oJ'Findings <br />Environmental Impact Report <br />As described in detail in Section 3.2 (Topography, Geology and Soils) in the EIR, foundation piles <br />could introduce contaminants such as drilling oil or construction materials into the Orange County <br />Groundwater Basin. <br />4.2.4.2 Findings Related to Groundwater <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br />4.2.4.3 Facts in Support of the Finding Related to Groundwater <br />Implementation of mitigation measure G-5, provided below, will substantially lessen the adverse <br />impacts of the One Broadway Plaza project related to. groundwater, and will reduce these <br />potentially significant adverse impacts to below a level of significance. <br />G-5 During final design, the developer will consult with the Orange County Water District <br />and the Regional Water Quality Control Board, Santa Ana, regarding intrusion of <br />foundation piles into the Orange County Groundwater Basin. The project applicant will <br />solicit the appropriate permits and approvals from the OCWD and the RWQCB for the <br />anticipated intrusion of the foundation piles into the Groundwater Basin and will <br />incorporate measures identified by those agencies in the final design and construction <br />specifications for the project. <br />4.2.2 IMPACTS RELATED TO HYDROLOGY AND WATER QUALITY <br />4.2.5.1 Potentially Significant Adverse Impacts Related to Hydrology and Water Quality <br />As described in detail in Section 3.3 (Hydrology and Water Quality) in the EIR, construction of <br />the project may generate surface runoff with pollutants that could impact area receiving waters. <br />4.2.5.2 Findings Related to Hydrology and Water Quality <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br />4.2.5.3 Facts in Support of the Finding Related to Hydrology and Water Quality <br />Implementation of mitigation measures W-1 to W-6, provided below, will substantially lessen <br />the adverse impacts of the One Broadway Plaza project related to construction related activities <br />which may generate surface runoff with pollutants, and will reduce these potentially significant <br />adverse impacts to below a level of significance. <br />W-1 Prior to the issuance of a grading permit for the project: <br />U/vfregoso/wp51/reports/0ne Broadway final findings Page 22 <br />June 28, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.