My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One Broadway Plaza Findings and Facts in Support of Findings <br />,Environmental Impact Report <br />4.2.3.2 Findings Related to Long Term Air Quality Impacts <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br />4.2.3.3 Facts in Support of the Finding Related to Long Term Air Quality Impacts <br />Implementation of mitigation measures AQ-16 to AQ-32, provided above, will substantially <br />lessen the adverse impacts of the One Broadway Plaza project related to long term air quality and <br />will reduce these potentially significant adverse impacts to below a level of significance, except <br />for to NO,, as described earlier. <br />4.2.4 IMPACTS RELATED TO SURFACE TRANSPORTATION <br />4.2.4.1 Potentially Significant Adverse Impacts Related to Surface Transportation <br />As described in detail in Section 3.5 (Transportation) in the EIR, the project may impact surface <br />transportation routes adjacent to or in the vicinity of the project site. In addition, the project may <br />impact surface transportation routes in the Willard, French Court and French Park neighborhoods. <br />4.2.4.2 Findings Related to Surface Transportation Impacts <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br />4.2.4.3 Facts in Support of the Finding Related to Surface Transportation lmpacts <br />Implementation of mitigation measures T-1 to T-17 will substantially lessen the adverse impacts <br />of the One Broadway Plaza project related to surface transportation, and will reduce many of <br />these potentially significant adverse impacts to below a level of significance. Some traffic <br />impacts are still significant after mitigation, as described earlier. <br />Measures T-1, T-4, T-5, T-6 and T-7 were provided earlier. The remaining traffic measures are <br />provided below. <br />T-2 The project proponent shall pay for all costs for the installation of a roundabout at the <br />intersection of Sycamore Street and loth Street. <br />T-3 The project proponent shall pay all costs to install pedestrian crosswalks and a refuge <br />area at the intersection of Sycamore Street and loth Street where a roundabout is to be <br />constructed. The project developer shall be required to pay all costs (design, <br />construction, administration and inspection) for these mitigation measures, as they are <br />part of the roundabout as stated in T-2. <br />Ulvfregosolwp51/reports/One Broadway final findings Page 25 <br />June 28, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.