My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-18_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
11-26-2018
>
11-26-18_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 2:22:53 PM
Creation date
8/16/2019 2:22:23 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 26, 2018 <br />Comment on Environmental Impact Report, 2525 N. Main Street Multi-Family Residential Project <br />(aka Magnolia at the Park) SCH 2018021031, DP No. 2017-34 <br />page 2 <br /> <br /> <br />site with 405,290 square feet of residential buildings that would provide 496 market- <br />rate multi-family residential units located at 2525 North (N.) Main Street, in the <br />northern portion of the City of Santa Ana approximately 500 feet east of Interstate 5 <br />(I-5) (“Project”). <br /> <br />After reviewing the DEIR and FEIR (collectively, “EIR”), we conclude that the <br />EIR fails as an informational document and fails to impose all feasible mitigation <br />measures to reduce the Project’s impacts. Commenters request that the Planning <br />and Building Agency address these shortcomings in a revised draft environmental <br />impact report (“RDEIR”) and recirculate the RDEIR prior to considering approvals for <br />the Project. We reserve the right to supplement these comments during review of <br />the Final EIR for the Project and at public hearings concerning the Project. Galante <br />Vineyards v. Monterey Peninsula Water Management Dist., 60 Cal. App. 4th 1109, <br />1121 (1997). <br /> <br />PROJECT DESCRIPTION <br /> <br /> The Project would demolish the existing 81,172 square foot vacant two-story <br />office building and 442 space surface parking lot to redevelop the 5.93-acre site with <br />405,290 square feet of residential buildings that would provide 496 multi-family <br />rental residential units. The Project would provide only market-rate housing, with no <br />units designated for low or moderate income residents. Of the units, 77 percent <br />would be studios or one-bedroom units, 18 percent would be two-bedroom units, <br />and 6 percent would be three-bedroom units. The residences would be provided <br />within 5-story buildings topped with mezzanines that would be approximately 65-feet <br />in height along the western and central portion of the site; and would tier down to 2- <br />story, approximately 20-foot high structures on the eastern portion of the site. The <br />residential units would be wrapped around a central parking structure that would <br />have 8-levels of parking above ground, and 1 level of underground parking. The <br />parking structure would be located in the west central portion of the project site and <br />would provide direct access to the leasing office and walkways to residential units. <br /> <br /> The proposed project would require the following discretionary approvals from <br />the City of Santa Ana: <br /> <br /> General Plan Amendment (GPA) Land Use Change from PAO (Professional <br />& Administration Office) to a District Center (DC) designation <br /> Amendment Application (AA) for a zone change from Professional (P) to a <br />Specific Development (SD) designation <br /> Development Agreement <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.