My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6 - GPA19-01; AA19-01_651 W SUNFLOWER AVENUE
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
6 - GPA19-01; AA19-01_651 W SUNFLOWER AVENUE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:40:29 PM
Creation date
8/16/2019 4:38:48 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Legacy Sunflower Apartments Page 94 <br />Mitigated Negative Declaration – March 14, 2019 <br /> <br /> <br />The project traffic report studied eight (8) area intersections and four (4) roadway segments to <br />determine if the project would impact the project area circulation system. The eight intersections and <br />four roadway segments were studied for the following six (6) traffic conditions: <br /> <br /> Existing (2018) <br /> Existing plus Project <br /> Year 2022 Cumulative traffic <br /> Year 2022 Cumulative plus Project <br /> Year 2040 <br /> Year 2040 plus Project <br /> <br />The traffic report assumed an ambient traffic growth factor of 1.0% per year. Therefore, from the base <br />year of 2018 to the project completion date of 2022 the growth factor is 4.0%. <br /> <br />The traffic report took into account the traffic that would be generated by the development of other <br />projects in the cities of Santa Ana and Costa Mesa that are close to the proposed project. The traffic <br />report estimated the traffic that is generated by the 16 cumulative projects listed in Table 30 and added <br />that traffic to the six traffic conditions listed above. The traffic report assumed a project completion date <br />of 2022 as proposed by the project applicant. Therefore, a project completion date of 2022 is shown as <br />the time the project would be completed. Year 2040 is included in the traffic report as requested by the <br />Orange County Transportation Authority (OCTA) using their OCTAM4.0 traffic computer model. <br /> <br />The traffic distribution pattern of the project is shown in Figure 19. The traffic distribution patterns are <br />based on the following: <br /> <br /> Location of site access points in relation to the surrounding street system; <br /> The site’s proximity to major traffic carriers and regional access routes; <br /> Physical characteristics of the circulation system such as lane channelization and presence of <br />traffic signals that affect travel patterns; <br /> Presence of traffic congestion in the surrounding vicinity, and <br /> Ingress/egress availability at the site. <br /> <br />The peak hour intersection capacity analysis for project traffic for the existing plus project, Year 2022 <br />plus project and Year 2040 plus project are shown in Tables 27, 28 and 29, respectively. As shown, <br />the project traffic would not impact any of the eight studied intersections with the exception of the Main <br />Street at Sunflower Avenue intersection. The Main Street at Sunflower Avenue intersection would be <br />impacted in the PM peak hour for years 2022 and 2040 both without and with the project. A mitigation <br />measure is recommended below to reduce the potential traffic impact at this intersection for both the <br />Year 2022 and Year 2040 conditions to meet City of Santa Ana transportation requirements. <br /> <br />Mitigation Measure No. 11 Prior to the issuance of the first occupancy permit, the project developer <br />shall modify the traffic signal at the intersection of Sunflower Avenue and <br />Main Street to provide a southbound right-turn overlap phase. <br /> <br />The traffic study prepared for the project complies with the traffic impact requires of the City of Santa <br />Ana and is consistent with the current Congestion Management Program (CMP) for Orange County.41 <br />The project would not impact any City of Santa Ana transportation requirements or the County CMP. <br /> <br />41 Traffic Impact Analysis Report, Legacy Sunflower Apartments, Santa Ana, California, Lincscott Law & Greenspan, January 24, 2019. <br />6-116
The URL can be used to link to this page
Your browser does not support the video tag.