My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWAYZER CORPORATION
Clerk
>
Contracts / Agreements
>
S
>
SWAYZER CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:23:41 PM
Creation date
9/4/2019 5:08:00 PM
Metadata
Fields
Template:
Contracts
Company Name
SWAYZER CORPORATION
Contract #
A-2019-141
Agency
PUBLIC WORKS
Council Approval Date
8/20/2019
Expiration Date
8/19/2022
Insurance Exp Date
12/1/2019
Destruction Year
2027
Document Relationships
SWAYZER CORPORATION (3)
(Amended By)
Path:
\Contracts / Agreements\S
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.4.4 WATERING <br />All shrubs shall be properly irrigated to maintain a healthy condition. Shrub areas shall be deeply <br />watered as required by weather conditions to provide adequate moisture for optimum growth. At no <br />time shrub areas shall be allowed to show a lack of fresh green color or a loss of resilience due to lack <br />of water. <br />Wherever or at any time that an irrigation system is damaged, fails or does not adequately cover the <br />shrub area in which it is installed, the Contractor shall furnish and set out hoses and sprinklers, or other <br />portable means, as required to uniformly water the shrub. <br />Automatic irrigation shall be conducted between the hours of 10:00 p.m. and 4:00 a.m. and shall be <br />programmed to prevent excessive runoff, ponding or over watering. <br />Shrub areas shall not be maintained in an over watered and/or saturated condition. <br />Contractor shall respond immediately to signs of plant stress. Plant material lost due to stress shall be <br />deemed Contractor negligence, as determined by the City of Santa Ana, and replaced at Contractor's <br />expense. <br />1.4.5 REPLANTING <br />The Contractor shall be responsible for the complete removal and replacement of shrubs lost due to <br />normal attrition or due to Contractor's faulty maintenance or negligence, as determined by the City of <br />Santa Ana, at no additional cost to the City. <br />1.4,6 CULTIVATION AND MULCH <br />All bare soil or open areas shall be either cultivated weekly or covered by a minimum of two (2) inches <br />of mulch. All mulch material shall be of a recycled product free from foreign grasses and weeds and <br />shall be approved by the City. At no time shall weeds be allowed to remain in bare or planted areas. <br />Shrubs shall be pruned as required to ensure clear vehicular and pedestrian visibility and clearance, <br />Remove broken or diseased branches and provide general containment and goad appearance. <br />Plant material encroaching onto or from City property shall be trimmed back to property line at City's <br />discretion depending on circumstance, i.e. plants growing over fences and sidewalks from private <br />property adjacent to contracted areas shall be trimmed back to the property line, <br />Prune shrubs to retain as much of the natural informal appearance as possible, consistent with intended <br />use, i.e. vines not growing into other plants, etc. Coordinate with City of Santa Ana, <br />Continuously remove any spent blossoms or dead flower stocks, as required, to present a neat, clean <br />appearance. <br />Plants growing over curbing and/or sidewalks shall be maintained even with the edge of the sidewalk <br />or curb and be trimmed on a natural taper rather than vertical, so as not to appear to be hedged. <br />City of Santa Ana - RFP 19-048 <br />Landscape Maintenance Services of Water Facllllles and Santa Ana Regional Transporlallon Center <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.