Laserfiche WebLink
All valve boxes, controllers, and backflow devices shall be kept clear of plant growth, <br />Contractor shall be responsible for periodic inspection of surface drains located within the landscaped <br />areas. These drains shall be checked to assure proper functioning. Remove any debris or vegetation <br />that might accumulate at the inlet and prevent proper flow of water. <br />Any erosion damage because of Contractor's failure to keep the surface drains clear shall be repaired <br />at Contractor's expense. <br />Irrigation and drainage system repairs shall be compensated on a time and materials basis as agreed <br />to by the Contractor and the City. <br />1.7. GENERAL MAINTENANCE AND CLEAN-UP <br />The Contractor shall collect all clippings, trimmings, cuttings, rubbish and debris, and posted signs at <br />all work sites and dispose of same in a lawful manner per contract requirements at the Contractor's <br />expense. <br />All trash and debris shall be removed from all worksites a minimum of one (1) time per week. <br />The Contractor shall rake, hand remove, or vacuum leaves that are not absorbed by planting. This shall <br />be done as often as required to maintain a neat appearance, or prevent plants from being smothered <br />by seasonal leaf drop at least weekly or as directed by City of Santa Ana. <br />After heavy windstorms, the entire contract area shall be cleaned of litter, fallen branches, etc. <br />Contractor shall respond to calls from City of Santa Ana immediately. Contractor shall patrol all areas <br />for trees down, fallen branches, hanging branches, debris, and other potential hazards. <br />The Contractor shall keep sidewalks and all paved areas in the medians and under overpasses swept <br />and cleaned of any debris, weeds, dirt, or soil. Tree wells shall be maintained weed free. <br />1.8, OTHER REQUIREMENTS <br />1.8.1 NEW CONSTRUCTION <br />Where new construction or redevelopment may involve a significant part of a work site, the City of <br />Santa Ana may delete a portion of or the entire work site from contractual maintenance during the <br />construction and plant establishment period. The deletion of this portion of work will be reflected as a <br />reduction in the monthly payment to the contractor. The amount of reduction will be based on the <br />percentage of area involved and agreed upon by the City and the Contractor. <br />1.8.2 INSPECTION <br />The City of Santa Ana shall weekly and/or as needed/upon request inspect the work area to ensure <br />adequacy of maintenance and that methods of performing the work are in compliance with the contract. <br />However, this shall not be construed to relieve the Contractor's supervisor of the duty to provide <br />continuous inspection of the work area. Contractor shall provide a dedicated supervisor to Santa Ana <br />City of Santa Ana - RFP 19.048 <br />Landscape Maintenance Services of Water Facilities and Santa Ana Regional Transportation Center <br />26 <br />