My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-10-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
FULL PACKET_2019-10-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2019 4:13:58 PM
Creation date
10/11/2019 10:29:44 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 TRAFFIC FORECASTING METHODOLOGY <br />In order to estimate the traffic impact characteristics of the proposed Project, a multi -step process <br />has been utilized. The first step is traffic generation, which estimates the total arriving and departing <br />traffic on a peak hour and daily basis. The traffic generation potential is forecast by applying the <br />appropriate vehicle trip generation equations or rates to the project development tabulation. <br />The second step of the forecasting process is traffic distribution, which identifies the origins and <br />destinations of inbound and outbound project traffic. These origins and destinations are typically <br />based on demographics and existing/expected future travel patterns in the study area <br />The third step is traffic assignment, which involves the allocation of project traffic to study area <br />streets and intersections. Traffic assignment is typically based on minimization of travel time, which <br />may or may not involve the shortest route, depending on prevailing operating conditions and travel <br />speeds. Traffic distribution patterns are indicated by general percentage orientation, while traffic <br />assignment allocates specific volume forecasts to individual roadway links and intersection turning <br />movements throughout the study area. <br />With the forecasting process complete and project traffic assignments developed, the impact of the <br />proposed project is isolated by comparing operational (LOS) conditions at selected key intersections <br />using expected future traffic volumes with and without forecast project traffic. The need for site - <br />specific and/or cumulative local area traffic improvements can then be evaluated and the <br />significance of the project's impacts identified. <br />75A-402 <br />
The URL can be used to link to this page
Your browser does not support the video tag.