My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2019-10-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
FULL PACKET_2019-10-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2019 4:13:58 PM
Creation date
10/11/2019 10:29:44 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 PROJECT TRAFFIC CHARACTERISTICS <br />5.1 Project Traffic Generation <br />Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either <br />entering or exiting the generating land use. Generation equations and/or rates used in the traffic <br />forecasting procedure are found in the 9 b Edition of Trip Generation, published by the Institute of <br />Transportation Engineers (ITE) [Washington D.C., 2012]. <br />Table 5-1 summarizes the trip generation rates used in forecasting the vehicular trips generated by <br />the proposed Project and also presents the project's forecast peak hour and daily traffic volumes. As <br />shown in the upper portion of Table 5-1, ITE Land Use 931: Quality Restaurant and ITE Land Use <br />946: Gasoline/Service Station With Convenience Market and Car Wash trip rates will be used to <br />forecast the trip generation of the existing development. ITE Land Use 945: Gasoline/Service Station <br />With Convenience Market will be used to forecast the trip generation of the gas station portion of the <br />proposed Project. Empirical trip generation estimates at Victorville Speedwash collected on <br />February 7, 2014 will be used to forecast the trip generation of the express car wash portion of the <br />proposed Project. <br />A review of the middle portion of this table indicates that the existing land uses generate 1,257 daily <br />trips, with 39 trips (21 inbound, 18 outbound) produced in the AM peak hour and 66 trips (37 <br />inbound, 29 outbound) produced in the PM peak hour. <br />A review of the lower portion of Table 5-1 indicates that the proposed Project is forecast to generate <br />2,235 daily trips, with 89 trips (48 inbound, 41 outbound) produced in the AM peak hour and 152 <br />trips (76 inbound, 76 outbound) produced in the PM peak hour. <br />Review of the last row of Table 5-1 shows that with application of existing trip credits, the proposed <br />Project is forecast to generate a new of 978 daily trips, a net of 50 (27 inbound, 23 outbound) AM <br />peak hour trips, and a net of 86 (39 inbound, 47 outbound) PM peak hour trips. <br />5.2 Project Trip Distribution and Assignment <br />Figures 5-1 and 5-2 present the trip distribution pattern for the gas station and commercial <br />components proposed Project, respectively. Project traffic volumes both entering and exiting the <br />project site have been distributed and assigned to the adjacent street system based on the following <br />considerations: <br />• location of site access points in relation to the surrounding street system, <br />• the site's proximity to major traffic carriers and regional access routes, <br />• physical characteristics of the circulation system such as lane channelization and presence of <br />traffic signals that affect travel patterns, <br />• presence of traffic congestion in the surrounding vicinity, and <br />• ingress/egress availability at the project site. <br />75A-403 <br />
The URL can be used to link to this page
Your browser does not support the video tag.