My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NILA SPORTS
Clerk
>
Contracts / Agreements
>
N
>
NILA SPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 2:09:23 PM
Creation date
10/17/2019 3:01:43 PM
Metadata
Fields
Template:
Contracts
Company Name
NILA SPORTS
Contract #
A-2019-180
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
10/1/2019
Expiration Date
9/30/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Energy Network <br />Summary of Scope of Work <br />1.1 Background <br />The City of Santa Ana is pursuing a number of lighting retrofits at several of their facilities. This <br />document focuses on the proposed lighting fixture and controls scope of work for the Jerome <br />Park's exterior lighting. Jerome Park a city owned and operated public park. The park consists of <br />baseball and softball fields, basketball courts, a community center, and a public pool. Additional <br />supporting documentation including an area by area breakdown of lighting equipment can be <br />found in the following appendices: <br />• Appendix A: Lighting Inventory <br />1.2 General Requirements <br />The following should be clearly stated in and/or provided with all bids: <br />a) Contractor shall provide copies of a valid California C-10 Electrical license at a minimum. <br />b) Prevailing wage labor costs to be used for project implementation. <br />c) All scheduling of work shall be done through the City's project contact. <br />d) All work performed shall meet or exceed any applicable electrical code requirements. <br />e) Any existing electrical code violations relevant to systems being retrofitted shall be brought <br />to the attention of the City once discovered. <br />f) Clean-up, removal of old equipment, and/or recycling fees are to be included. <br />g) Contractor must meet appropriate insurance and bond requirements outlined by the City. <br />h) Any other cost of business fees/expenses associated with performing City work are to be <br />included in the bid. <br />i) Provide factory start up and training (if necessary) to ensure proper functionality of new <br />lighting equipment and controls. <br />j) All work shall be warranted against defects in material and workmanship for a period of <br />one year from the date of acceptance. Any applicable warranty information beyond this <br />should be stated and provided upfront. <br />k) The contractor is required to provide a detailed and Itemized invoice that clearly states the <br />quantity of each fixture installed. Additionally, the invoice shall show a breakdown of <br />material, labor, tax, shipping, and any other applicable project costs. <br />I) It is the Contractor's responsibility to submit a final version of the Lighting Audit Table, <br />Attachment A in parallel with the submittal of the Cost Proposal. Any revisions required to <br />the Scope of Work must be clearly indicated in the final Lighting Audit Table and reflected <br />in the Cost Proposal. The final Lighting Audit Table serves to inform the Agency. <br />i*nerg n tlhiork 12-4 <br />pub x agemws takmr edion to save energy <br />
The URL can be used to link to this page
Your browser does not support the video tag.