My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NILA SPORTS
Clerk
>
Contracts / Agreements
>
N
>
NILA SPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 2:09:23 PM
Creation date
10/17/2019 3:01:43 PM
Metadata
Fields
Template:
Contracts
Company Name
NILA SPORTS
Contract #
A-2019-180
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
10/1/2019
Expiration Date
9/30/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Energy Network <br />m) As needed, Contractor is responsible for finalizing and revising fixture model numbers. <br />For example, if the specified LED driver is not compatible with the on -site electrical service, <br />the contractor is responsible for updating the model number and specifying the proper <br />driver. Any fixture model updates need to be approved by City, prior to equipment order. <br />n) Contractor will be compensated for work performed and fixtures installed. Any increase <br />on the Base Price due to larger inventory will require written approval by the Agency and <br />will follow procedures set forth for change orders. Any decrease on Base Price due to <br />smaller inventory will result in a lower Base Price to the Contractor. <br />o) The Contractor shall conduct all work during the time window established after the contract <br />is awarded. <br />p) The Contractor shall comply with safety requirements and practices as outlined in <br />accordance with Agency requirements and California Occupational Health and Safety <br />Administration (Cal/OSHA). <br />q) The Contractor shall do all that is necessary to maintain a safe working environment for <br />Contractor's employees, Agency and facility employees and the general public present. <br />r) The Contractor shall work with the Agency facility staff to understand and abide by any <br />site -specific security procedures. <br />s) The Contractor shall clean up any construction dust, dirt and debris from work surfaces or <br />equipment after work is completed each day and prior to occupancy. <br />t) The Contractor shall be very careful to leave the facility with no damage to its structure, <br />contents, existing finishes, and with no evidence of cutting or patching, and with all fixtures <br />and lenses cleaned. <br />u) The Contractor is responsible for securing all necessary permits, including Title 24 energy <br />code documentation and compliance permit, and shall abide by local laws and regulations. <br />v) Prior to ordering of equipment and fixtures, Contractor is to verify fixture quantities, types <br />and installation needs, including specifying equipment that complies with existing electrical <br />service. Final project invoice price will be based upon the quantity of each fixture type <br />installed multiplied by the unit price for that fixture. <br />w) Prior to ordering of lighting fixtures, Contractor is to verify proposed are listed in the Design <br />Lights Consortium (DLC). Contractor is to propose a valid replacement for fixtures that are <br />not DLC certified. <br />x) The chosen contractor will be required to register with Southern California Edison as a <br />Trade Professional (Trade Pro). Directions to register can be found at: <br />https://sreonlineapp.com/CAASupport/Default.asox. Please note that contractor will NOT <br />be required to produce a Project Feasibility Study or Energy Efficiency Project Influence <br />Job Aid, <br />wnetwork <br />oubhcagenrvc akin) lam, to save anorgy <br />12-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.