My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NILA SPORTS
Clerk
>
Contracts / Agreements
>
N
>
NILA SPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 2:09:23 PM
Creation date
10/17/2019 3:01:43 PM
Metadata
Fields
Template:
Contracts
Company Name
NILA SPORTS
Contract #
A-2019-180
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
10/1/2019
Expiration Date
9/30/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Energy Network <br />Appendix A: Lighting Inventory <br />Title 24 <br />She Baacription <br />Ralsting Lighting System <br />proposed Lighting System <br />Requirements <br />ITEM # <br />Locatlon and/or Room <br />Room <br />Solution <br />Fkt. Code <br />Mixture Description %Nptlan <br />Pam, Fx(, <br />�,kW/ <br />&, <br />Totel <br />Proposed Mature Description* <br />Prop. <br />Fig. <br />Occupancy <br /># <br />Typo <br />Code <br />011 <br />Il <br />kW <br />QI <br />$anaora9 <br />i <br />Jerome Center Exterior <br />Exterior <br />LT-19132 <br />CFL20WP <br />MCK.Alpeok <br />5 <br />0.03 <br />- <br />I.Bhania Oi LED 13W40K Me <br />s <br />N <br />2 <br />Bull Field <br />Bxtador <br />LT-05834 <br />M41500PM <br />1500W Metal Miss Sports Lighting- <br />iBt <br />Phase. 550W Soon. Lighting AR55M63 <br />36 <br />N <br />Pole Abun1 <br />L840-BLK•'^ <br />3 <br />Bell Field area <br />F:Iterlor <br />LT-85834 <br />M aDFL000 <br />250W Matel Halitla Fbotl fdiwe on ball <br />g <br />0.30 <br />Me 78W Flood Light+NS(FXLm]8TN <br />9 <br />Y <br />poles. 20 it. <br />$M5500 <br />4 <br />$nadc A.. <br />Fxterbr <br />LL85834 <br />MH/0CM <br />SOW Metal Halide ceiling Mount Cenopy <br />4 <br />0.10 <br />- <br />20W Me Cenopy(VANL®204 <br />4 <br />N <br />Future <br />"The Contractor Is responsible for finalizing fixture model numbers <br />"-The Contractor is responsible for confirming all fixture counts, pre and post case. <br />*4°The Contractor is responsible for confirming Title 24 compl lance for all applications, Including installation of Occupancy Sensors where applicable. <br />....The Contractor Is responsible for the setup, calibration, and positioning of the Ephesus Lighting Fixtures <br />± fenergVnetvufor`s <br />"-1 uvOt.,'o' oiiq r fom!o s'aa erm�Y <br />12-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.