My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - 2525 N MAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/19/2019
>
75D - PH - 2525 N MAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 7:54:38 PM
Creation date
11/14/2019 5:55:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
11/19/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction equipment so that emitted noise is directed away from the noise sensitive receptors nearest the <br />Project site. <br />The construction contractor shall locate equipment staging in areas that will create the greatest distance <br />between construction -related noise sources and noise -sensitive receivers nearest the Project site during all <br />construction. <br />Mitigation Measure NO1-3: The Project plans and specifications shall include the requirement to install a minimum <br />11-foot high temporary construction noise barrier along the Project site eastern boundary for the duration of Project <br />construction. The noise control barriers shall have a solid face from top to bottom and shall meet the following height <br />and constructed requirements: <br />• The temporary noise barrier shall provide a minimum transmission loss of 20 dBA (Federal Highway <br />Administration, Noise Barrier Design Handbook). The noise barrier shall be constructed using an acoustical <br />blanket (e.g. vinyl acoustic curtains or quilted blankets) attached to the construction site perimeter fence or <br />temporary fence posts. <br />• The noise barrier shall be maintained, and any damage promptly repaired. Gaps, holes, or weaknesses in the <br />barrier or openings between the barrier and the ground shall be promptly repaired, <br />• The noise control barrier and associated elements shall be completely removed, and the site appropriately <br />restored upon the conclusion of the construction activity. <br />3.9 Population and Housing <br />Summary of Impacts Identified in the EIR <br />As described in Section 4.9, Population and Housing, of the DEIR, the Original Project would not induce substantial <br />population growth. SCAG anticipates a population increase of 8.4 percent by 2040 or an average annual increase of <br />0.4 percent throughout the County. The anticipated population that would result from the Original Project would be <br />0.28 percent of the City's population, and thus, within the projected population growth. Similarly, SCAG anticipates the <br />number of housing units would increase 6.3 percent or an average annual increase of 0.3 percent through 2040. Thus, <br />the 496 new multi -family units developed by the Original Project would also be within the SCAG projected growth. <br />Furthermore, the infrastructure improvements needed to serve the Original Project would be sized to specifically serve <br />the development and excess capacity would not be developed that could generate additional growth. Thus, the EIR <br />determined that impacts related to population, housing, and related growth would be less than significant. (DEIR, p. <br />4.9-7 through 4.9-10.) In addition, the EIR determined that addition of housing by the Project would have a favorable <br />effect on the jobs -housing balance. (DEIR p. 4.9-9.) <br />Comparison of Impacts Associated with the Proposed Modified Project <br />Housing and Population Growth <br />As described previously, the Modified Project would develop 240 fewer residential units (48.4 percent less) than the <br />Original Project. As shown on Table P-1, the reduction in units and change in the unit type mix proposed by the <br />Modified Project would result in 453 fewer residents at full occupancy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.