My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-107 - Proposed Addington Multi-Family Residential Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-107 - Proposed Addington Multi-Family Residential Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:44:22 AM
Creation date
11/25/2019 11:00:29 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-107
Date
11/19/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been determined to represent a reasonable range of alternatives to supplement the access alternatives <br />presented in the DEIR. The alternatives presented have been determined to be physically feasible and have <br />the potential to avoid or substantially lessen one or more of the significant effects of the Project. The <br />Alternatives include: <br />• Alternative 1: No Project/No Build <br />• Alternative 2: Reduced Project Alternative <br />• Alternative 3: Build Out of the Existing Zoning Alternative <br />12.5 Evaluation of Alternatives Selected for Analysis <br />Alternative 1: No Project/No Build <br />Description: Pursuant to Section 15126.6(e)(2) of the CEQA Guidelines, the FIR is required to "discuss <br />the existing conditions at the time the Notice of Preparation is published, or if no notice of preparation is <br />published, at the time the environmental analysis is commenced, as well as what would be reasonably <br />expected to occur in the foreseeable future if the Project were not approved, based on current plans and <br />consistent with available infrastructure and community services." Therefore, under this alternative, no <br />development would occur on the Project site and it would remain in its existing condition. However, as <br />described in Section 6.4 of the DEIR, the Project site is located within a completely developed and highly <br />used urban corridor, near freeways and transit, and contains an existing useable structure, and it is not <br />reasonable to assume that the Project site would remain vacant and underutilized in the long-term. In the <br />No Project/No Build condition, it is reasonably expected that the existing 81,172 square foot office <br />building would be re -occupied. Hence, this alternative compares impacts of the Project with re -occupation <br />at full capacity of the existing office building. (DEK p. 6-4.) <br />Environmental Effects: The No Project/No Build Alternative would avoid the significant and <br />unavoidable aesthetic impact that would result from the Project and all of the potential construction <br />impacts. Additionally, operational impacts would be reduced and the mitigation measures that are <br />identified in Chapter 4.0, Mitigation Monitoring and Reporting Program, of the Final EIR which include <br />measures related to aesthetics, biological resources, hazards and hazardous materials, noise and vibration, <br />and tribal cultural resources would not be required. (DEIR, pp. 6-6 through 6-11.) <br />However, the environmental benefits of the Project would also not be realized, such as improvements to <br />storm water quality, removal of contaminated soils, improvements to the jobs/housing balance, and the <br />potential to reduce vehicle miles traveled. The No Project/No Build Alternative would not install storm <br />water filtration features in accordance with DAMP and LID design guidelines that would filter and slow <br />the volume and rate of runoff; the arsenic contaminated soils would remain onsite; and this alternative <br />would provide for the projected employment growth but would not improve the jobs to housing balance <br />within the region and could generate more vehicle miles traveled. <br />Ability to Achieve Project Objectives: The No Project/No Build Alternative would not meet any of the <br />Project objectives. (DEIR, p. 6-11.) The site would not be redeveloped into new high -quality housing near <br />existing employment centers, commercial areas, freeways, and transit. Capital investment related to the <br />Project site to enhance the City's economic and fiscal viability pursuant to the City of Santa Ana Strategic <br />Plan would not occur, and a safe, high -quality, modern residential community with open space and various <br />recreation amenities would not be implemented by this alternative. Overall, this alternative would not <br />meet any of the objectives of the Project. (DEIR, p. 6-11.) <br />Resolution No. Page 69 of 76 <br />Certification of the Magnolia at the Park EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.