Laserfiche WebLink
TRAFFIC SAFETY • SIGNS <br />trunP. statew ides•afeI y. com <br />CA CONTRACTOR LICENSE N975515 — CLASS A. C-31, C-32 & C-61/D-42 DIR PW #1000001109 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete are Sedion E for each kev oersom.) <br />Branch Manager <br />LOCATION�Ii TITLE AND — <br />(2) YEAR COMPLETED <br />Branch Manager- Grove, CA PROFESSIONAL SERVICES CONSTRUCTION (Happq aFW;) <br />N/A Ongoing <br />a. <br />BRIEF DESCRIPTION (edefsmpe, size, coat, etc.) AND SPECIFIC ROLE ®Check if project pedomred with cunant firm <br />Manages STSSI operations in Garden Grove, California which services Los Angeles and Orange Counties of California. Projects under my <br />1(3) <br />management range from construction area signs, traffic design, traffic control, traffic detours, temporary and permanent signage, crash <br />attenuation, and work zone safety. <br />. e <br />(2) YEAR COMPLETED <br />. • . • , PROFESSIONAL SERVICES I CONSTRUCTION (Ifappkable) <br />WA Ongoing <br />b <br />(3) BRIEF DESCRIPTION(adef=Pe, size. cost eC) AND SPECIFIC ROLE ® Check if project performed with current firm <br />Branch Manager, Garden Grove <br />On -Call Traffic Control Contract <br />.... <br />(2) YEAR COMPLETED <br />NJ PROFESSIONAL SERVICES CONSTRUCTION(Oeppacable) <br />WA Ongoing <br />C. <br />(3) BRIEF DESCRIPTION (Bdefampe, We. cost ek.) AND SPECIFIC ROLE ® Check s project performed with current fine <br />Branch Manager, Garden Grove <br />On -Call Traffic Control Contract <br />. . <br />(2) YEAR COMPLETED <br />r . , . , - . , • , . , PROFESSIONALSERVICES CONSTRUCTION (Ifapplfcable) <br />NIA 12016 <br />(3) BRIEF DESCRIPTION (Bdefacope, sizes cost W-) AND SPECIFIC ROLE ® Check it project performed with ..rent firm <br />d <br />Branch Manager, Garden Grove/Riverside, CA <br />Work Included managed traffic control, construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals & sales of traffic control and safety equipment. <br />Project widened the IA05 through the Sepulveda pass from HID to US Route 101, and overall construction cost was >$1 billion. Statewide <br />portion of work was rou hl $55 million. <br />e (2) YEAR COMPLETED <br />r r , • , e PROFESSIONAL SERVICES ONSTRUCTION (Ifapplicable) <br />WA 2017 <br />(3) BRIEF DESCRIPTION (after scope, size. cost. etc.) AND SPECIFIC ROLE <br />e, ®Check d project performed with torten[ firm <br />Branch Manager, Garden Grove/Riverside, CA <br />Work includes permanent roadside signs, PCBM's (permanent concrete barder markers), and Class 1 Delineators. <br />Overall construction valued at - $316 million; Statewide subcontracted for - $119K. <br />