My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STATEWIDE TRAFFIC SAFTEY AND SIGNS, INC
Clerk
>
Contracts / Agreements
>
S
>
STATEWIDE TRAFFIC SAFTEY AND SIGNS, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2020 11:16:41 AM
Creation date
3/14/2020 11:10:52 AM
Metadata
Fields
Template:
Contracts
Company Name
STATEWIDE TRAFFIC SAFTEY AND SIGNS, INC
Contract #
A-2020-039
Agency
PUBLIC WORKS
Council Approval Date
3/3/2020
Expiration Date
3/2/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LA <br />TRAFFIC SAFETY & SIGNS <br />1PTrtiv.stateividesafely. com <br />CA CONTRACTOR LICENSE #975519 - CLASS A, C-31, C-32 & C-61/13-42 DIR PW N1000001 Inv <br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(1) TITLE AND LOCATION (CIyaWSMre) (2) YEAR COMPLETED <br />Dispatcherl Project Manager- • PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />NIA Ongoing <br />a <br />(3) BRIEF DESCRIPTION (Bdefsmpe, sae, msl. ek.) AND SPECIFIC ROLE ® Check rprelect performed.0 currant fin <br />Dispatcher / Project Manager for STSSI Garden Grove, California which services Los Angeles and Orange Counties of California. Dispatch <br />and coordinate labor, material and equipment for projects relating to construction area signs, traffic design, traffic control, traffic detours, <br />temporary and permanent signage, crash attenuation, and work zone safety. <br />(2) YEAR COMPLETED <br />• •• • , PROFESSIONALSERVICES CONSTRUCTION(Ifapp#cable) <br />WA Ongoing <br />D <br />BRIEF DESCRIPTION (Bdafecope, Size. cost etc.) AND SPECIFIC ROLE ® Check If prajed performed with currem firm <br />1(3) <br />Dispatcher / Project Manager, Garden Grove <br />On -Call Traffic Control Contract <br />(2) YEAR COMPLETED <br />, PROFESSIONAL SERVICES CONSTRUCTk3N(lfeppHCable) <br />WA Ongoing <br />7=ope.size.AND SPECIFIC ROLE®Check if Prefect performed wiN curtent firmden <br />rDispatcher <br />Grove <br />(2) YEAR COMPLETED <br />1 • • - • , • , . , , - , PROFESSIONAL SERVICES CONSTRUCTION ofepprcable) <br />WA 2016 <br />(3) BRIEF DESCRIPTION (BdefsmPe, size. cost etc.)AND SPECIFIC ROLE <br />® Check if project performed with current firm <br />d. <br />Dispatcher / Project Manager, Garden Grove/Riverside, CA <br />Work included managed traffic control, construction area signs, crash arrays, temporary and permanent signage, overhead signs and <br />structures, and rentals 8 sales of traffic control and safety equipment. <br />Project widened the M05 through the Sepulveda pass from 1-10 to US Route 101. and overall construction cost was >$1 billion. Statewide <br />oprfion of work was rou hl $55 million. <br />(2) YEAR COMPLETED <br />1 . _ • ROFESSIONAL SERVICES ONSTRUCTION (#applicable) <br />. .. - • WA 2017 <br />B. ,wn Iener smpe. We, cost. ea:.)AND SPECIFIC ROLE ® Check d project performed with curent firm <br />Dispatcher / Project Manager, Garden Grove/Riverside, CA <br />Work includes permanent roadside signs, PCBM's (permanent concrete barrier markers), and Class 1 Delineators. <br />Overall construction valued at - $318 million; Statewide subcontracted for- $119K. <br />
The URL can be used to link to this page
Your browser does not support the video tag.