My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NATIONAL CORROSION (2)
Clerk
>
Contracts / Agreements
>
N
>
NATIONAL CORROSION (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:21:47 AM
Creation date
3/19/2020 3:58:36 PM
Metadata
Fields
Template:
Contracts
Company Name
NATIONAL CORROSION
Contract #
N-2020-071
Agency
PUBLIC WORKS
Expiration Date
3/15/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[JH7J. NATIONAL National Corrosion <br />ri CORROSION www.notional-corrosion.com <br />Deliverables <br />Preliminary repair procedures and Specifications — National Corrosion will produce written procedures <br />and coating specifications as a draft to be reviewed by the City of Santa Ana. Comments and revisions <br />may be made at this time. <br />Final Design —This task will include preparation of standard drawings and specifications (90% and Final): <br />90% Design Submittal —Prepare drawings and technical specifications for the proposed repairs <br />and coating specifications approved by the City after the Preliminary Report was submitted and <br />reviewed. Plans shall be drawn to scale (lightened record drawing plans may be used as a <br />background) and suitable for competitive public works bidding. The designed CP systems will be <br />contained within the city property and/or public right-of-way. A project schedule, and <br />engineer's estimated construction cost may be a part of the submittal. The plans and <br />specifications will be provided for the city to review. After incorporation of city comments into <br />the documents, hardcopies will be submitted to the pertinent cities for review, comment, and <br />applicable permit applications. The city will pay the permit review fees directly. <br />Final Design Submittal — All revisions from 90% design review will be used to prepare the final <br />plans and specifications. This submittal shall include final construction plans, bid item schedule <br />including quantities, descriptions, specifications, and technical provisions for the project. An <br />engineer's estimate of probable construction costs will also be included. A complete set of <br />construction plans and specifications via digital copies in PDF format and 2018 version of <br />AutoCAD .dwg format (with pen settings file) will be provided. National Corrosion shall provide a <br />copy of all required permits along with construction requirements if necessary. <br />Construction Phase / Inspection <br />Submittal/Shop Drawing Review —Review Contractor submittals for completeness and <br />conformity with the contract documents. Review any deviations and/or substitutions submitted <br />by the contractor and make recommendations to the city. <br />Requests for Information (RFIs) — Review contractor's request for information and prepare <br />responses to the contractor. Prepare any revisions to contract documents necessary to resolve <br />conflicts. Assume 10 RFIs. <br />Inspection and Quality Control — Aid the city during repairs and procedures by providing on -site <br />as -needed inspection services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.