Laserfiche WebLink
w ; REQUEST FOR PROPOSAL <br />j, Water Resources Construction Management and Inspection Services <br />(RFP NO. 19-118) <br />folders, CDs, etc.) manner in both electronic and hard copies. <br />27. Provide a redline set of as -built plans. <br />Task 2 - Construction Inspection Services <br />In general, the Michael Baker Inspector will have the necessary <br />experience and knowledge of construction, equipment, materials, <br />methods, and workmanship for street improvement, traffic signal, <br />streetlight, stormwater diversion system, pretreatment systems, storm <br />drain, force main, stormwater pump station, control systems, stormwater <br />filtration systems, landscape and irrigation, and specific work necessary <br />to be performed on the proposed projects. <br />The Michael Baker Inspector will be able to understand and interpret <br />Plans and Specifications and will be familiar with the Greenbook <br />(Standard Specifications for Public Works Construction), pertinent <br />various Standards and codes, and OSHA Construction Safety Orders <br />The Michael Baker Inspector will be able to interact professionally <br />with contractors, engineers, business owners, residents; and respond <br />promptly and courteously to requests. The Michael Baker Inspector will <br />be able to follow verbal and written instructions, communicate clearly <br />and concisely. <br />Typical Michael Baker Inspection services will include, but not be limited <br />to: <br />1. Review the Plans and Specifications thoroughly prior to the pre - <br />construction meeting. Attend pre -construction meeting. <br />2. Establish effective communications with the Contractor, other <br />agencies, residents, utilities, and commercial business and property <br />owners. Handle and resolve businesses/residential complaints. <br />3. Possess appropriate valid inspector certifications and licenses for the <br />work to be inspected, including deputy inspection required of various <br />trades. Ensure compliance with the Plans, Specifications, and other <br />requirements, such as, but not limited to, the Contract, Traffic Control, <br />Cal/OSHA Standards, CCO, Permits, Standard Plans, checking line, <br />grade, size, elevation, and location of improvements. <br />4. The monitor contractor's compliance with the Storm Water Pollution <br />Prevention Plans (SWPPP). <br />5. Attend the progress construction meetings. <br />6. Keep daily diaries (log), fill out Incident (accident) Reports, and take <br />pictures of the project. A daily Inspection Report identifying work done by <br />the Contractor will be submitted to the Michael Baker Project Manager <br />on the next business day for review and filing. <br />7. Keep a daily Inspection report log identifying work done by the <br />Contractor for review and filing. Also the log will include weather <br />conditions, construction equipment on site, list of contractor and sub- <br />contractor employees, and other pertinent information. The inspector will <br />issue "Order to Comply" notices when necessary. <br />8. Document all Contractor delays, reasons for delay, length of <br />time for delay, and Phases of work. Monitor and provide supporting <br />documentation on the personnel and equipment that is involved with any <br />extra work performed by the Contractor. <br />9. During the course of inspection and monitoring of the work, if the <br />Inspector observes an unsafe situation, he will notify the Contractor <br />of the violation and provide written notification of such infraction to <br />the Contractor. If the Contractor refuses to comply, the Michael Baker <br />Inspector will notify the City and Cal OSHA. <br />10. Coordinate material sampling and testing with City's on —call <br />geotechnical company. <br />11. Review the Contractor's invoices, verify completed work, and <br />approve all quantities. <br />12. Prepare a list of items for correction (punch list) and prepare redlined <br />as -built plans. <br />13. Possess a vehicle with insurance and a mobile phone for immediate <br />contact by the City and show proof of a valid California's driver's license. <br />Possess a notebook computer with wireless e-mail capability, and will <br />take relevant daily construction images. <br />FEE PROPOSAL <br />The fee Proposal has been submitted as a separate document and <br />uploaded onto Planet Bids. <br />.6JI"'66aA;Q"a' Proposal I Page 19 Water Resources RFP No. 19-118 <br />INTERNATIONAL <br />