My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steven Slocum, PLS I Survey <br />Steven has years of progressive surveying experience. He has worked on several significant projects, including; boundary <br />and street monumentation, topographic data collection, HDS ground based Lidar (laser scanning) surveys, aerial control and <br />validation surveys, grading and utility construction staking, control, and settlement and deformation monitoring. Mr. Slocum <br />has worked as a Party Chief on projects including laser scan surveys, pipeline alignment staking, settlement monitoring, and <br />tunnel alignment verification. <br />Sewer Master Plan and Capital Improvement Program, Long Beach, California. Port of Long Beach. Party <br />Chief. Responsible for field surveys. Michael Baker provided engineering services to the Port of Long Beach for its <br />sewer master plan and capital improvement program within the Harbor District. Services included developing and <br />analyzing a hydraulic model of the sewer system, updating the geographic information systems (GIS), performing <br />closed circuit television (CCTV) inspection of 24 miles of pipeline, performing a condition assessment of 449 <br />manholes and 40 lift stations, performing a flow monitoring and inflow and infiltration (0) study, and preparing a <br />sewer master plan and capital improvement program. <br />On -Call Professional Civil Engineering Services Port of Long Beach, Long Beach, California. Port of Long <br />Beach. Party Chief. Responsible for field surveys. Under an on -call, five-year contract, Michael Baker is providing <br />a variety of design and engineering services. To date, the primary task orders have included: Task order no. 1 - Pier <br />D Water System Interconnect; Task order no. 2 - Pier C Sewer Abandonment Project; Task order no. 3 - Matson <br />Terminal Berth 60 Pavement Condition Investigation; Task order no. 4 - Trailer Village PS&E; Task order no. 5 - Pier <br />D Roadway Improvements; Task order no. 6 -Anaheim/ 1-710 Health and Safety Services; Task order no. 7 - Middle <br />Harbor Pavement Analysis and Report; and Task order no. 8 - Interim Headquarters Tenant Improvements 4801 <br />Airport Plaza Drive. <br />Atlantic Avenue Cast Iron Main Replacement, Long Beach, California. Long Beach Water Department. Party <br />Chief. Responsible for field surveys. Michael Baker provided engineering services for approximately 10,000 <br />linear feet of new eight -inch ductile iron pipe to replace the cast iron water main on Atlantic Avenue between the <br />intersections with 405 Freeway/Spring Street and Pacific Coast Highway. Michael Baker's services included design, <br />permitting, and traffic control. <br />Orange Unified School District Storm Water Management Services, Orange, California. Orange Unified School <br />District. Party Chief. Responsible for field surveys. Michael Baker assisted the Orange Unified School District with <br />stormwater management services. The district was subject to the Phase II Small Municipal Separate Storm Sewer <br />System (MS4) Permit. Michael Baker assisted the district in understanding and meeting the requirements of the <br />various stormwater permits that potentially impacted the Lampson Elementary School Modernization project. Michael <br />Baker worked with the district and the city to establish an appropriate water quality strategy to meet applicable <br />NPDES permits. Michael Baker also provided survey services for a three -acre parking lot at a high school site and <br />designed a treatment best management practice (BMP) to meet the requirements for post -construction BMPs as part <br />of the construction general permit. <br />Years with Michael Baker: 16 <br />Years with Other Firms: 1 <br />Education: <br />A.A., Certificate of Surveying, <br />Santiago Canyon College <br />Licenses / Certifications: <br />Transportation Worker <br />Identification Credential <br />(TWIC), California, 2011 <br />Certified Party Chief, <br />California <br />Professional Land Surveyor, <br />California, 2013, 9044 <br />Proposal I Appendix Water Resources RFP No. 19-118 <br />INTERNATIONAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.