|
Nora Doyle I Construction Management Coordinator
<br />Nora is responsible for construction management coordination of a wide variety of construction projects in both the public
<br />and private sector. These projects have included water and sewer pipelines, reservoirs, pump stations, lift stations, wells,
<br />water treatment plants, SCADA, telemetry, start-up, testing, storm drains, grading, roadways, traffic signals, medians,
<br />bridges, parks, sports parks, aquatic parks, and public buildings. Her work has involved document control during the
<br />planning, design, construction, and post -construction phases of work for the purpose of achieving project objectives
<br />involving quality, schedule, and budget. Marketing responsibilities have included: preparing proposals, SOQ's, and interview
<br />presentations; identifying key issues; developing scopes of work; preparing fee estimates; and tracking project leads.
<br />Marshall Bowen Pumping Plant, Whittier, California. City of Whittier. Project Coordinator. Responsible for
<br />construction management coordination. Michael Baker provided design engineering services and construction phase
<br />support, including full-time construction management and inspection services, for the Whittier Utility Authority's
<br />(WUA) Pumping Plant No. 2, which was originally constructed in the 1930s. Michael Baker identified off -site
<br />improvements to increase operational capability of existing facilities; evaluated pump station and control schemes;
<br />provided hydraulic analysis; and performed structural and electrical engineering, surveying, and mapping. Michael
<br />Baker also provided final plans, specifications, and estimates (PS&E); CEQA compliance (notice of exemption); and
<br />construction management and inspection.
<br />1-5/Ortega Highway Interchange Pipeline Relocation, San Juan Capistrano, California. City of San Juan
<br />Capistrano. Project Coordinator. Responsible for construction management coordination. Michael Baker provided
<br />construction management and inspection services on a pipeline replacement project, which included installation
<br />of 3,611 linear feet of 12-inch PVC pipe and 700 linear feet of 12-inch CML&C pipe constructed in the 1-5 bridge;
<br />abandonment and relocation of water lines; services and appurtenances; and the removal of ACP. Michael Baker's
<br />duties included project management; contract administration; construction management; construction inspection;
<br />scheduling; public relations; monitoring the Contractor's traffic control and safety plans; monitoring environmental
<br />compliance, surveying, soils and material testing, and welding testing; and testing and startup.
<br />Marshall R. Bowen Pumping Plant No. 2 Replacement Construction Management, Pico Rivera, California. City
<br />of Whittier. Project Coordinator. Responsible for construction management coordination. Michael Baker provided
<br />construction management and inspection for this pumping plant replacement project that included demolition and
<br />disposal of the existing pumping plant facility and appurtenances; creation of geotechnical engineered in -situ sub-
<br />surface structural soil compaction improvements; construction of a 6,400-square-foot pump building that houses
<br />an 18.9 MGD pump station; erection of two 2.2 MG above ground steel tank reservoirs and associated yard piping;
<br />and extensive system -wide SCADA system upgrades. The project also included off -site improvements for six other
<br />reservoirs that involved replacement of existing valves and vaults associated with pipeline tie-in connections and
<br />SCADA systems upgrades. Completed in February 2016, the new Pumping Plant 2 Facility was re -dedicated as the
<br />Marshall R. Bowen Pumping Plant and includes a 18.9-MGD pump station with 17,500 gpm of pumping capacity to
<br />enable WUAto pump during off-peak periods and reduce power costs; two 2.2-MG above -grade steel reservoirs to
<br />serve as the forebay and provide operational storage; a 6,400-square-foot pump building, including office space for
<br />water production and pumping plant personnel; new piping and control valves at off -site reservoirs; and upgraded
<br />SCADA and radio communication facilities throughout the entire VVUA service area.
<br />Years with Michael Baker: 19
<br />Years with Other Firms: 20
<br />Education:
<br />Coursework, General
<br />Education, University of
<br />California, Irvine
<br />Coursework, General
<br />Education, Orange Coast
<br />College
<br />Licenses / Certifications:
<br />First Aid/CPR Training,
<br />California. 2013
<br />Proposal I Appendix Water Resources RFP No. 19-118
<br />I N T E R N Ai 10 N AL
<br />
|