My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
domestic water pipe and 30" cement mortar lined and coated steel recycled water pipe. There <br />were numerous conflicts with existing utilities, provided assistance in navigating installing new <br />pipelines in existing street while maintaining continuous service and keeping roadway open during <br />the three years of construction. Site had high groundwater, which required dewatering the project <br />with extensive well points continuously during the project into Baker tanks. Provided coordination <br />with multiple agencies and assisted in keeping communication open with residents living adjacent <br />to project. Inspected all pipe installation, testing, backfill and compaction, tie-ins to existing water <br />system. <br />• Alton Roadway, City of Irvine, CA. Provided construction inspection for $40-million joint venture <br />project between the County of Orange and City of Lake Forest. The project consisted of rough <br />grading new roadway approximately one mile. Installed storm drain box and associated storm <br />drain pipe, new 16" AWWA C-905 PVC gravity sewer pipe and manholes, new 24", 16", 12" and <br />8" domestic waterlines, new 24", 16" and 12" recycled waterlines. <br />Portola Hills Sewer Lift Station Abandonment and Gravity Sewer, City of Irvine, CA. <br />Provided construction inspection for this $2-million project consisting of removal of an existing lift <br />station piping and pumps, concrete structure and slurry fill the force main piping in place. <br />Removed all electrical cabinets and wire. Installed 5000' of 12" pvc SDR 35 pipe. Excavated and <br />shored a trench in existing street, set up traffic control detour and installed pipe. Checked traffic <br />control daily and checked all material as well ensuring the gravity pipeline was installed on line <br />and grade. Observed all backfill and compaction with native material and schedule soils <br />technician for testing. <br />• Lift Station No. 6 Forcemain Replacement Project for the South Coast Water District — <br />Project Inspector during AKM's construction management of the project which consisted of 900 <br />lineal feet of 12-inch SDR 35 PVC gravity sewer and eight (8) manholes, 2,250 lineal feet of 18- <br />inch AWWA C905 sewer forcemain with epoxy lined and coated ductile iron fittings, temporary <br />bypass system, tie-in of new facilities to existing gravity sewer and forcemains, protection of <br />existing facilities in -place, and repaving/restripe streets to restore existing condition. The <br />forcemain construction is within Pacific Coast Highway in the City of Dana Point. <br />AKM Prop. 20-1004 25F-393 Appendix B - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.