My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oxnard Village is an approximately 60-acre privately funded <br />redevelopment project located at the westerly gateway to the City <br />of Oxnard, along the 101 Freeway. The under-utilized site contained <br />1950's era motel, mobile home park, retail/commercial and light <br />manufacturing uses. This mixed use project will ultimately include <br />1,500 residential units with row -houses, podium stacked flats, live - <br />work units and luxury high rise condominiums and luxury hotels. Four <br />parking lots have already been designed which included aesthetic, <br />decorative lighting, water quality, space, enhanced paving, vehicular, <br />pedestrian and disabled access, as well as drainage challenges. <br />In each case, both a functional and aesthetically pleasing built <br />environment resulted. The project is ongoing and will continue development while serving the City of Oxnard for <br />many decades into the future. <br />RELEVANT DESIGN <br />COMPONENTS: Mulitple Parking Lots <br />Street Improvements Landscaping <br />Sewer, Domestic Water Water Quality <br />Reclaimed Water Vehicular & Disabled Access <br />Storm Drain <br />Flood Control <br />Huitt-Zollars was responsible for the Topographic <br />Survey for that portion of Warner Avenue from <br />westerly of Main Street to easterly of Oak Avenue. <br />Work included establishment of horizontal control <br />based on the centerline of Warner Avenue and the <br />establishmentof vertical control; tying outthe existing <br />centerline monumentation prior to construction <br />and the preparation of Pre -Construction Corner <br />Records to be used during the construction phases <br />of the project by surveyors doing boundary work in <br />the area and for replacement of the monuments <br />that were destroyed during construction; setting <br />and control of aerial targets and photo ID points; <br />flight, photography, and compilation of the aerial <br />topographic mapping; cross-section survey at 25 <br />foot intervals and a detailed design survey of all <br />existing improvements from R/W line to R/W line; <br />and the preparation of a Topographic Map showing <br />the results of the work. <br />.......... <br />CLIENT CONTACT: <br />City of Santa Ana <br />Kenny Nguyen <br />20 Civic Center Drive <br />Santa Ana, CA92702 <br />714.647.5632 <br />CLIENT <br />CONTACT: <br />Oxnard CRFL <br />Partners <br />Carl Renezeder <br />64 Maxwell <br />Irvine, CA 92618 <br />949.719.9040 <br />RELEVANT DESIGN <br />COMPONENETS: <br />Topographic Survey <br />HUITTZOLLARS <br />2§� Sam9RGall Water ReJi s' Resources Engineering <br />ring Services RFP No. 19-10013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.