My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars prepared the design of approximately 6,000 of 12" HDPE highline for recycled water to assist the <br />Water district in the transportation of recycled water through the Santa Margarita Water District. Huiit-Zollars also <br />assisted the Santa Margarita Water district in the design and construction of a booster pump station to boost the <br />pressure of the recycled water line through multiple pressure zones. <br />Additionally, Huitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe <br />materials and underground the highline into a casing and create a crossing of a secondary arterial highway. The <br />design was completed to allow for the maintenance of the pipe without disrupting traffic on the highway. <br />RELEVANT DESIGN <br />COMPONENTS: <br />Survey <br />• Engineering Estimates <br />• Water Improvements <br />Nardy Khan - Deputy Director <br />County of Orange Public Works <br />300 N. Flower Street <br />Santa Ana, CA 92702 <br />714.920.7454 <br />nardy.khan@ocpw.ocgov.com <br />CLIENT CONTACT <br />Santa Margarita Water District <br />Jamie Aguilar <br />26111 Antonio Parkway <br />Rancho Santa Margarita, CA <br />92688 <br />949.459.6400 <br />& PublicWorks <br />HZ prepared PS&E and right-of-way documents for the County's 3.7-mile-long, $75 Million La Pate Avenue gap closure and widening <br />project. <br />Liza Munoz, PE - Senior Office Engineer Inland Empire Utilities Agency <br />Inland Empire Utilties Agency A MUNICIPAL WATER DISTRICT <br />6075 Kimball Avenue <br />Chino, CA91708 <br />909.993.1522 <br />Imunoz@ieua.org <br />Maria Fraser - CIP Engineering Manager <br />City of Chino Public Works <br />13220 Central Avenue <br />Chino, CA91710 <br />909.334.3406 <br />mfraser a@cityofchino.org <br />HZ designed a roadway widening along El Prado Road an in vv� e for the City of Chino. <br />HUITTZOLLARS dT Sa to Call Water Resources Engineering Services RFP No. <br />19-100 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.