Laserfiche WebLink
Mazen Kassar, PE <br />Task Manager— Electrical & Controls <br />Mr. Kassar has more than 27 years of experience in electrical <br />engineering and industry standards that include electrical engineering <br />staff management, project management, construction management and <br />supervision, water and wastewater treatment, petro-chemical design, and <br />environmental soil and groundwater treatment. His background includes <br />designing medium and low voltage power distribution, designing <br />instrumentation, control systems and SCADA systems for a wide variety <br />of projects, and the installation of electrical systems for remediation <br />projects, including soil vapor extraction systems, and groundwater pump - <br />and -treat systems. <br />EXPERIENCE <br />Well No. 32, City of Santa Ana, Santa Ana, CA. Electrical Engineer for <br />the design of the Well 32 rehabilitation project. The project involved the <br />rehabilitation of the well facility. The underground well would be scraped, <br />cleaned and modified to be within an above ground CMU block control <br />building (housing mechanical and electrical rooms). The electrical <br />components include providing power and control to the well and for <br />production of the on -site generation sodium hypochlorite facility. In <br />addition, a new fiber optic line would connect the well to John Garthe <br />Reservoir approximately 3,500 feet away. The alignment will be in the <br />same trench as the 12-inch discharge pipe to the reservoir. <br />Education: <br />B.S., Electrical Engineering, <br />California State University, Long <br />Beach, 1990 <br />Registrations/Certifications: <br />Professional Electrical Engineer, <br />California, No. 15809, 1998 <br />General Construction, Class B <br />California, No. 777845, 2008 <br />Contractor - C-10 Electrical, <br />California Class C — Specialty, <br />No. 777845, 2000 <br />ETAP Electrical Power <br />Modeling, 2010 <br />Professional Affiliations: <br />Institute of Electrical and <br />Electronics Engineers <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />27 <br />Years with Tetra Tech: <br />10 <br />Long Beach 8 Valve Improvement Project Electrical Power System <br />Upgrade, Long Beach Water Department, Long Beach, CA. Tetra Tech provided full -service Construction <br />Management Services for the Long Beach Water Department during construction for Long Beach Valve 8 <br />Improvement Project. Work involved connection to the MWD pipeline at the Long Beach Valve 8 project sites, <br />just east of the intersection of Wardlow Road and Cherry Avenue, complete with pipeline replacements and <br />electrical and instrumentation upgrades. Mr. Kassar provided electrical and SCADA assistance during startup of <br />the facility. <br />Santa Ana River Interceptor Relocation Project, Orange County Flood Control District, Santa Ana, CA. <br />Provided preliminary and final electrical design services for relocation of 19,500 If segment of 54-inch trunk <br />interceptor, 6,000 If of 15- and 18-inch sewer mains, flow metering station, and the decommissioning of the <br />existing trunk interceptor segment. The project included the installation of two separate siphons below the Santa <br />Ana River using micro -tunneling construction method while complying with multiple environmental and <br />permitting constraints. <br />Maxine Lift Station Bypass Connection Project, City of Santa Ana, Santa Ana, CA. The purpose of the <br />Maxine Lift Station Bypass Connection Project was to install a connection on the existing force main that would <br />allow the City to bypass sewer flows around the existing lift station utilizing a portable pump from the existing <br />wet well to the force main. Managed the electrical power system studies which included load flow, short circuit, <br />and arc flash calculations. <br />Crooke Reservoir Electrical Upgrade, City of Santa Ana, Santa Ana, CA. Electrical Engineer for the design <br />of the replacement of the existing motor control panels and switchboards for Crooke Reservoir pump station, <br />Well 27 and Well 28. <br />Pyrite Canyon Treatment Facility, State of California, Department of Toxic Substances Control, Glen <br />Avon, CA. Performed 30 percent and 60 percent design of electrical power and distribution system for the new <br />treatment facility. The design included sizing solar system to feed the new plant; sizing power equipment like <br />inverts, step up and step down transformers; overhead and underground distribution, switchboard, MCC and <br />cable trays; performing load flow and short circuit studies using ETAP power modeling software. <br />TETRA TECH <br />