Astrid Fleischer, PE
<br />Task Engineer — Electrical & Controls
<br />Ms. Fleischer is an electrical and controls systems engineer with 28 years
<br />of experience in water treatment, capital improvement and industrial control
<br />projects. Ms Fleischer's electrical and controls design experience includes
<br />projects in California and overseas involving Modicon Quantum Automation
<br />Platform, Siemens Simatic PI -Cs, Allen Bradley RSLogix5000
<br />programming, installation and support services for Wonderware InTouch
<br />HMI, Wonderware Active Factory, Wonderware Historian, installation and
<br />maintenance of Marathon Endurance VTvirtual Redundant Server
<br />Systems, SNMP Network Management implementation and integration into
<br />Plant HMI and network design, configuration and troubleshooting.
<br />Additionally, Astrid is proficient in standard configuration of Schneider
<br />Electric Network Infrastructure Devices (Fiber Optic Repeaters, Switches),
<br />interface programming for Profibus DP and design and integration of
<br />Process Control Application interfacing with Variable Frequency Drives.
<br />EXPERIENCE
<br />Education:
<br />B.S., Electrical Engineering,
<br />University of Nuremberg,
<br />Germany, 2000
<br />Industrial Technologist,
<br />vocational College for Electrical
<br />Engineering and Data Systems
<br />Technology, Erlangen,
<br />Germany, 1991
<br />Registrations/Certifications:
<br />Registered Professional
<br />Engineer in Control Systems,
<br />California No. CS 7440, 2012
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />28
<br />Years with Tetra Tech:
<br />Alavardo WTP, Miramar WTP, Otay WTP, City of San Diego, CA. Ms. I I
<br />Fleischer is participating in the preparation of a feasibility report to upgrade the existing SCADA system's
<br />hardware and software, which has reached end of life, to a current generation of SCADA system infrastructure.
<br />Responsible for researching options for transitioning the existing Stratus everRun FT servers and the SCADA
<br />system's Wonderware applications to a current generation SCADA system.
<br />Tujunga Spreading Grounds, Las Angeles County, Los Angeles, CA. Ms. Fleischer is providing networking
<br />and instrumentation design services for the Tujunga Spreading Grounds Telemetry System Design and
<br />Construction Support project.
<br />Water Replenishment District of Southern California, GRIP — Advanced Water treatment Facility, CA. I&C
<br />Engineer. Piping and instrumentation diagram (P&ID) design. Process Ethernet and Profibus network design for
<br />integrating Modbus M580 Controllers and Modbus RIOS with EtherneUlP, Modbus TCP or Profibus DP capable
<br />instrumentation and Siemens Smart Motor Control Centers (MCC) as well as Wonderware System Platform
<br />2014 redundant servers (with InTouch for System Platform, Device Integration Servers and Historian).
<br />Reviewed Instrumentation & Control, Control Panel, Building Facility and Electrical Submittals including but not
<br />limited to submittals for instrumentation, PLC and SCADA, valve operators, pumps with appurtenant motors,
<br />security system, access control system, solar system, HVAC system, motor control center, variable frequency
<br />drives, and lighting. Responsible for keeping project documents such as piping and instrumentation diagrams
<br />(P&ID), PLC input/output lists, specifications, as well as conduit and cable schedules up to date.
<br />SCADA System Project, West Basin Municipal Water District, Carson, CA. 1&C Engineer. Specified the
<br />project's network equipment and technology (4G cellular) as well as the SCADA application software (SCADA
<br />Expert Clear SCADA) for the new SCADA network.
<br />Alamitos Barrier Telemetry System Upgrade, County of Los Angeles Department of Public Works, Los
<br />Angeles, CA. I&C Engineer. Specified the project's Siemens S7-1200 control system and network equipment.
<br />Designed the project's control and instrumentation panels including panel load calculations and design of the
<br />photovoltaic power supply for the control panels. Prepared project documents such as conduit schedules,
<br />project drawings and project specifications.
<br />Pyrite Canyon Treatment Facility, State of California, Department of Toxic Substances Control, Glen
<br />Avon, CA. I&C Engineer. Reviewed Instrumentation & Control and Electrical Submittals from vendor supplied
<br />packaged systems such as filter presses, bag presses, air compressors, booster pumps, inclined plate clarifiers,
<br />flocculating clarifiers and others. Reviewed control panel design submittals and electrical drawings. Responsible
<br />for keeping project documents such as piping and instrumentation diagrams, PLC input/output lists, Master
<br />Equipment Lists as well as conduit and cable schedules up to date. Preparation of Functional Specifications and
<br />preparation of Operations and Maintenance Manual.
<br />TETRA TECH
<br />
|