Don Lee, PG, CHG
<br />Hydrogeology
<br />Mr. Lee has more than 30 years of professional and managerial
<br />experience in hydrogeological assessments, well drilling, water well
<br />design and construction, water well profiling and testing, percolation
<br />testing, environmental soil and water quality assessment and remedial
<br />strategy, design, and implementation, feasibility studies, remedial action
<br />plans and compliance activities, vapor extraction system design, and
<br />technical review.
<br />EXPERIENCE
<br />City of Lakewood, CA. Designed a 2,000 gpm capacity municipal water
<br />supply wells for City of Lakewood. Completed well siting, permitting
<br />assistance, well design and technical specifications. Well drilling,
<br />installation, and testing are to begin in 2019.
<br />City of Huntington Beach, CA. Provided hydrogeological evaluation and
<br />well design for a 3,000 gpm capacity municipal water supply well for City
<br />of Huntington Beach. Project activities performed include well siting,
<br />permitting assistance, well design, and technical specifications.
<br />Education:
<br />Certificate, Applied
<br />Groundwater Flow and
<br />Contaminant Transport
<br />Modeling, Waterloo
<br />Hydrogeologic, Sacramento,
<br />California, 2006
<br />B.Sc., Geology, University of
<br />Alberta, Canada, 1988
<br />Registrations/Certifications:
<br />California Registered
<br />Professional Geologist No. 7406
<br />California Certified
<br />Hydrogeologist No. 810
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />30
<br />City of Torrance, CA. Provided technical review and oversight for the construction of municipal water supply
<br />wells Well No. 10 and Well No. 11 and the destruction of Well No. 6. The new wells are approximately 600-foot
<br />deep and designed for a sustainable yield of 3,000 gpm.
<br />Water Replenishment District of Southern California, Los Angeles County, CA. Managed well profiling of
<br />municipal water production wells owned by the City of Inglewood, Park Water Company, Maywood Mutual
<br />Water Company #1, Maywood Mutual Water Company #3, Pico Water District, City of Bell Gardens, City of
<br />Compton, City of Huntington Park, City of Vernon, City of Manhattan Beach, West Basin Municipal Water
<br />District, City of Lakewood, and City of Los Angeles for Water Replenishment District of Southern California. Well
<br />profiling utilizes miniaturized equipment without removing the well pump and motor, thereby saving costs. Well
<br />profiling included ambient and dynamic flow profiling, video camera surveying, and depth -discrete water quality
<br />sampling to determine the flow and chemistry of water entering different zones across the perforated intervals of
<br />the well. Provided evaluation and recommendations to improve well performance and water quality.
<br />City of Los Angeles Department of Water and Power, Los Angeles, CA. Conducted hydrogeological
<br />evaluation and feasibility study for installing municipal water wells in Central Basin for LADWP. The study
<br />included hydrogeologic, water production, and environmental data review and groundwater modeling to estimate
<br />expected production, water quality, costs, potential impacts from long-term groundwater pumping, and optimal
<br />well sites.
<br />Water Replenishment District of Southern California, Pico Rivera, CA. Designed and managed construction
<br />of three 800-foot deep groundwater recharge wells and one nested monitoring well adjacent to San Gabriel
<br />River for the Water Replenishment District of Southern California's Groundwater Replenishment Improvement
<br />Program. Work included preparing technical specifications, NPDES permitting and reporting, geologic and
<br />geophysical analysis to identify appropriate zones for groundwater recharge, well design that incorporated glass
<br />bead filter pack, well construction oversight, well development, and aquifer pumping tests.
<br />TETRA TECH
<br />
|