Laserfiche WebLink
YEARS EXPERIENCE <br />39 <br />YEARS WITH FIRM <br />20 (Firm's Owner) <br />PRIMARY WORK LOCATION <br />San Diego <br />EDUCATION <br />BS. Civil Engineering. <br />San Diego State University, <br />1980 <br />Leading Professional Service <br />Firms, Harvard Business <br />School <br />LICENSES / <br />CERTIFICATIONS <br />Civil Engineer. California No. <br />36175 <br />Diplomate, American <br />.Academy of Environmental <br />Engineers, No. 97-20026 <br />PROFESSIONAL <br />AFFILIATIONS <br />American Public Works <br />Association <br />American Water Works <br />Association <br />San Diego County Water <br />Works Group <br />r <br />i <br />�gi <br />Richard Brady, PEw BCEE <br />Principal in -Charge & Project Iblanaper <br />Prof essiorlal Summary <br />Richard Brady is the founder, President and Chief Executive Officer of Richard Brady <br />&.Associates (BRADY). He has 39 yaars of experience in water resources planning <br />and in the design, management, and constructoo administration of drinking water <br />supply projects. His fields of specralizatlon include: predesign, design. value <br />engineering, construction management. and start tip services for many large <br />at water treatment plants, pump stations. and reservoir projects. Mr. Brady is <br />a graduate of Harvard Business School's "Leading Professional Service Firms" and <br />the "Owner -President Management" program. He is also an Internationally - <br />recognized water engineer, and a contributing author to the AWWA's 'Water <br />Treatment_ Plant Design". He has served as the Program Manager for the City of San <br />Diego Water Infrastructure Master Plan. and his design experience includes <br />nationally -acclaimed water treatment facilities. <br />Project Experience <br />35 MG Earl Thomas Reservoir Demolition and Replacement Project, <br />Client: Malcolm Plmie and the City of San Diego <br />Title: Project Manager <br />Design of a 35 MG presU essed concrete, circular reservoir 411 feet in diameter and <br />40 feet tall. Responsible for civil site work, including the appurtenant piping, <br />pumping, and Flow control equipment required for operation of the new clearwell. <br />Design services include preparation of civil site plans; structural. mechanical, and <br />electrical drawings, and supplemental specifications for the prestressed concrete <br />tank. <br />Two Partially Buried 21 MG Prestressed Concrete Reservoirs <br />Client: City of San Diego, California <br />Title: Project Manager <br />Managed construction administration phase of the reservoirs. Each reservoir has a <br />diameter of 311 feet and a water depth of 39 feet. A portion of the roof of one of the <br />reservoirs became a Native Plant Demonstration Garden featuring plants indigenous <br />to San Diego. From this garden, the nature study area of the canyon below and <br />areas surrounding the plant are interpreted. <br />4.5 MG Miramar Ranch North Reservoir <br />Client City of San Diego <br />Tilde: Project Manager <br />Managed the design and construction phase of a 4.5 MG pre -stressed concrete <br />reservoir. <br />1.1 MG Alvarado Water Treatment Plant Filter Backwash System Rehabilitation <br />Client. Malcolm Pirnia and the City of San Diego <br />Title: Project Manager <br />Design and construction of a 1.1 NIG prestressed concrete, circular backwash tank <br />65 feet in diameter and 45 feet tall. <br />Responsible for civil site work, including the appurtenant piping, pumping, and flow <br />control equipment to replace the existing filter backwash system for eight 120 mgd <br />filter modules. Design services include preparation of civil site plans: structural. <br />mechanical. and electrical drawings; and supplemental specifications for the <br />prestressed concrete tank. <br />RICHARD BRADY & ASSOCIATES, INC. E-23 <br />