Laserfiche WebLink
BRADY Richard r ye PE, BCEE <br />Princioai in -Charge & Project Nlaneoer <br />Point Loma Water Tank and Pipeline <br />Client: City of San Diego <br />Tale: Project Manager <br />Design of a 650.000 gallon pre -stressed conerc [ resenvoir, and 1,000 feet or 12nnch diaru t i steel pipeline to <br />son✓a, indussrial and flrerleW requirements at the Point Loma Wa t evaf. Treatrreot Plant. <br />3.2 MG Santa Ynez Reservoir <br />Clients Santa Ynez River Water Conservation District <br />Title: Project Manager <br />Managed the construction phase of a 3.2 MG pre -stressed concrete reservoir and responded to contractor <br />requests for clarifications and provided project assistance to resident construction manager. <br />17 MG Conventionally Reinforced and Buried Los Coches Reservoir <br />Client. Padre Dam Municipal Water District <br />Responsible for predesign, design, and construction management. <br />1.O MG Steel Tank and Booster Pump Station Client U.S. Navy <br />Responsible for predesign, design, and construction management. <br />3.3 MG Shadowridge (Lupine Hills) Reservoir <br />Client: Vista Irrigation Oistrict <br />Responsible for predesign. design, and construction management of a partially buried prestressed concrete <br />reservoir. <br />Otay Water Treatment Plant Upgrade <br />Client: Montgomery Watson Harza <br />Title: Project Manager <br />Design of a new U.V. disinfection system and ancillary facilities, including yard piping, grading, chlorine contractor. <br />and related work to be added to the existing water treatment plant. The plant is designed for an immediate <br />upgrade to 40 mgd and for the future expansion to 60 mgd. Project included the study of plant hydraulics and <br />emergency power requirements. <br />City of Poway WTP Aqua Ammonia Feed Facility <br />Client City of Poway <br />Title: Project Manager <br />Design of a new aqua ammonia facility at the 36 mgd Lester J. Berglund Water Treatment Plant in the City of <br />Poway. <br />Design of a new chemical feed building, chemical storage facility. concrete enclosure for the 6,000-gallon aqua <br />ammonia tank. and new yard piping. Responsible for review and approval of contractor submittals and request for <br />information. <br />Seismic Evaluation Study of Three Prestressed Concrete Reservoirs <br />Client: City of Cerritos <br />Title: Project Manager <br />Performed a seisinic evaluation study of three prestressed concrete reservoirs. The first reservoir is a 12 MG <br />partially buried concrete reservoir. The second and third are both 6 MG above ground reservoirs. Investigated <br />current condition and structural integrity of each reservoir through an examination or all project related <br />documents. Participated in a site investigation, and performed detailed analytical structural calculations, and <br />developed a preliminary structural design and cost estimate to retrofit the reservoirs. <br />Overmyer Booster Station and Reservoir Rehabilitation Project <br />Client: City of Huntington Beach <br />Title: Project Manager <br />0) RICHARD BRADY &ASSOCIATES, INC. E-24 <br />