Laserfiche WebLink
JOINED FIRM <br />2016 <br />PROFESSIONAL <br />EXPERIENCE <br />BEGAN <br />2006 <br />LICENSES AND <br />CERTIFICATIONS <br />PE C77580. CA <br />EDUCATION <br />M.S., Structulai <br />Engineering. UC San <br />Diego. CA, 2007 <br />B.S. Civil <br />Engineering, Univ. of <br />Minnesota, 2006 <br />B.A., Mathematics. <br />Macalester College. <br />Mr. 2004 <br />PROFESSIONAL <br />AFFILIATIONS <br />AWWA CA -NV Fault <br />Structures & <br />Reservoirs <br />Committee <br />American Society of <br />Civil Engineers <br />E,.gineers Without <br />Borders USA <br />Structural Engineers <br />Association of <br />California <br />U <br />Ilrrlt�t�)I�J !I liirii,.lE, I" l"' { <br />Team Leader & Engineer -Diver <br />Professional Summary <br />With 1.3 yearrs ar <ocr.anc< if, �ngmeean-,,onsulting, NIL'. Finklet na. orred to of J.cr na aver <br />ant Si ocnlffl Jo3igneng!nlconnumeausinftastrurtuc of locta Experience-ncludes <br />ar r orng as essments: 3tructuial rehabilitation destgm preparation and <br />cooirlination ofconstruct,on locumecrs assomhhng design build olc,tauons: and prowdolg <br />constn_iction suoport services. <br />Mr. E,rkler spociahzes in the evaluation of existing srructures and the design and executon of <br />follow oil repairs and upgrades. He 'has pefonned field engineering investigations on hundreds of <br />varying Struchlree including reservoirs. foundations, pipelines, , uriliry vaults. piers. wharves, <br />seawalls. floating docks. rera',ning •malls. eotl bridges across the United Statas and abroad. Clients <br />include municipalities, energ9 orgaw7ahons. the US Department of Defense, state DOTS, utility <br />ownel's. and -.Onstr'urtlon contractois. <br />Inspection & Safely Credentials <br />BRADY Cnmpany Safety Committee Chairman <br />ADCI Surface -Supplied Air Diver & Diving Supervisor. UW Bridge Inspector LHWA-NHI-1300911 <br />OSHA Confined Space Entrant; ENV-385-40: OSHA-30. Trench & Excavation Competent Person <br />1st Aid/CPR/AED First Responder & Oxygen Proviclei <br />Project Experience <br />Inspector Team Leader, El Morro Reservoir No.11 Tank Inspection, City of Laguna Beach, <br />California. Led the structural condition assessment of a 5 MG ractangWar concrete reservoir. <br />Assembled assessment report that included dOnUinentatiOn of findings, photos. figures, <br />prioritization and recommendations for repairs. and estimates of probabie costs. Follow-on work <br />to include a seismic analysis and design of repairs for the existing structural systems. <br />Project Manager, LlftStatlon #9 Rehabilitation, South Coast Water District, Dana Point, California. <br />Executed sUuctural investigation and condition assessment in a confined space concrete dry well <br />structure. The effort included evaluation of several rehabilitation options. from which a fiber <br />reinforced polymer (FRP) solution was selected. Design or repairs and the procuction of <br />construction docwnents was followed ov bidding and construction support services. <br />Inspection Team Leader & Engineer Diver, Clubhouse Lake System Improvements, Fairbanks <br />Ranch Association, California. Oversaw execution of above and below water condition <br />assessment at the Clubhouse Lake Dam, with a focus on the piping outlet structures. The effort <br />included production of plans. Specifications. and estimates for improvements to the existing <br />facilities. Prodded CM resident engineer services during the construction phase. <br />Inspector Team Leader, AT&T Utility Vault Inspections, Southern California Region. Provided <br />engineering assessment Serf/IoeS In Support of new Fiber optic cable installation throughout <br />Southern California. The scope of services included engineering inspection and identification of <br />allowable core locations in over 500 utility vaults. A signed and stamped core certification report <br />was produced for each vault. Rosponsible for oversight and coordination of engineering team and <br />participation in vault iinspectrons. <br />Field Engineer, 5 MG Reservoir 11, City of Fountain Valley, CA. Performed engineering construction <br />supporf services. including: structural observations, identification of defective concrete areas, and <br />general oversight of work progress. The work at this 1971 partially buried circular concrete <br />reservoir included minor structural repairs and majorsito civil improvements. Foe: $200k. <br />Engineer -Diver, Hyperion Water Treatment Plant Cutfall Pipe, Los Angeles, California. Engineer <br />diver performed underrvatar inspection work. The one mile long, approximately 20-foot diamater <br />oufall pipe carries wastewater treatment plant effluent into the ocean. Inspection focused on the <br />concrete pipe encasement and concrete pipe support collars. <br />RICHARD BRADY & ASSOCIATES, INC. E-35 <br />