JOINED FIRM
<br />2006
<br />PROFESSIONAL
<br />EXPERIENCE BEGAN
<br />2000
<br />EDUCATION
<br />B.S. Electrical
<br />Engineering
<br />University of
<br />California. San Diego,
<br />2005
<br />LICENSES /
<br />CERTIFICATIONS
<br />Professional
<br />Electrical Engineer
<br />California, No.
<br />20050
<br />SDG&E Qualified
<br />Designer Applicant
<br />(OH)
<br />PROFESSIONAL
<br />AFFILIATIONS
<br />0
<br />Ryan Hishimum, P.E.
<br />Electrical Engineer/SCADA/I&C
<br />Prof'ssiooul sunnmary
<br />M•. Nishimura o a Prof= , cnal Engineer •vith 13 years of prof: ssional eye? n: n -ngi reenng.
<br />�lh Nishimura s slsc pr r tent In VijrCad, AutoCaci P&ID. AutoCAD Plant 3D, E7AP iLoad Flow.
<br />Short QlCW t. Dr ive Coordination & Arc Flash Analysi ). Vlicrostahor. Plantspace P&ID.
<br />Sketchup. Allen Bradley RSLogi� 500/5000. Schneider Electric Concept. Control Nlioresystems
<br />Telepace. Allen Bradley FactoryTalk. GE Fanuc Proficv. and Wondc-rvara InToucn as weh as
<br />programming exparienca in Matlao. Visual Basic. C. Java. KML Ifor use with, Googie Earth,, and
<br />relay ladder logic programming. In addition to engineering design work, NV. Nishimura also has
<br />extensive field experience during installation and startup/commissioning of electrical and
<br />industrial control systems ;n the built environment.
<br />Project Experience
<br />Electrical & Control Systems Engineer, North City Pure Water Facility Project, City of San Diego -
<br />ihe Project consisted of -electrical design for the new 34 MGD Pure Water Plant in San Diego. The
<br />plant utilizes Ozone. BAC filtration, Ultra filtration, Reverse Osmosis. UV and CO2 systems. The
<br />power requirements were 12l 15MVA Main Electrical Building, medium voltage 1000HP pumps
<br />at the pump station. and multiple orocess systems. The DCS system is networked to the North City
<br />plant that also feeds the raw water to the new plant. Smart MCCs and ARC resistant svvrtchgear
<br />were incorporated into the design. Multiple valve networks and analyzer networks were part of the
<br />design along with a fully integrated security system. Provided electrical and controls syste,n
<br />design. which included power, grounding, lighting, controls, and integration to the City DCS
<br />system.
<br />Electrical & Control Systems Engineer, Pump Station, City of Upland- The project consisted of a
<br />new 7.5 rvIG pra-stressed concrete reservoir, chlorine injection system, and site amendments.
<br />Provided electrical and controls system design, which included SCE coordina :on, power.
<br />grounding, lighting, controls, and integration to the Ciry's SCADA system.
<br />Electrical & Control Systems Engineer, Reservoir 2 and Pump Station, City of Fountain Valley- The
<br />project consisted of a new booster pump station. SCADA system. and upgrades to the existing 5
<br />MG reservoir and existing site. Sewer lift station 106 was completely replaced and upgraded.
<br />Provided electrical and controls system design. which included SCE coordination. power,
<br />grounding, lighting, controls, and integration to the City's SCADA system via the existing fiber optic
<br />network.
<br />Electrical & Control Systems Inspector/Construction Manager, SCADA Upgrades Project, City of
<br />Westminster - This project consisted of providing the City with an upgraded SCADA system to
<br />maintain and operate their water system. The system consists of ten wells. a reservoir, and three
<br />turnout connections to MWD. This project included multiples pluses of working closely with the
<br />City operations to assess all sites to determine the conditions and needs it each site to develop
<br />an RFP and assisting in Ma bidding phase to select a design -build contractor. During the design
<br />phase, assistance ,mas provided to review all design and provide input and review comments.
<br />During construction. field inspections were performed to verify that all aspects or the RFP and
<br />needs of the City were incorporated.
<br />Electrical and Control Systems Designer, WBtitegates Reservoirs #4 and #2, City of Riverside -
<br />Desigmbuild project involved the design of two but reinforced concrete reservoirs and two
<br />buried booster pumping stations. Reservoirs volume totaled 9 MG. Work included design.
<br />obtaining permits. excai construction of concrete reservoirs and booster stations, backfill,
<br />grading underground Ubhbes. electrical. SCADA and instrumentation, water quality enhancement.
<br />interconnections to existing utilities, site improvements (consisting of. but not limited to:
<br />landscaping, drainage, lighting, security, access road), testing. and startup of the four facilities.
<br />BRADY also provided design, programming. commissioningand startup services for thie on
<br />Programmable Logic Controllers jPLCs) and Opeiator Interface Terminals (OITs). Assisted in
<br />producing the Piping Instrumentation and Controls, and the Electrical designs. programmed the
<br />PLCs and OITs at both pump stations and participated in loop checks, startup and commissioning
<br />at the tsvo facilities.
<br />RICHARD BRADY & ASSOCIATES, INC, E-36
<br />
|