My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICHARD BRADY & ASSOCIATES, INC-A-2020-064
Clerk
>
Contracts / Agreements
>
R
>
RICHARD BRADY & ASSOCIATES, INC-A-2020-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 11:06:20 AM
Creation date
5/6/2020 4:05:37 PM
Metadata
Fields
Template:
Contracts
Company Name
RICHARD BRADY & ASSOCIATES, INC
Contract #
A-2020-064
Agency
PUBLIC WORKS
Council Approval Date
4/7/2020
Expiration Date
4/6/2023
Insurance Exp Date
7/1/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />YEARS EXPERIENCE <br />37 <br />EDUCATION <br />Houston Technical <br />Institute, 1977 <br />University of Houston. <br />1978-1979 <br />University of California <br />Los Angeles, 1989 <br />0 <br />Senior <br />Profs9iona1 Suntrnary <br />.Mr. Reyes has 37 years of design experience in drafting, management. and systems <br />administration In the fields of Architecture and Civil, Structural Engineering. His design <br />program experience includes AutoCAD 123 yrs) and MieroStation ;25 yrsl. He is highly <br />proficient in both applications with ass emphasis on system configurations and <br />troubleshooting. He has a complete understanding of the BiNI Industry standard and <br />can integrate various models. In addition to direct project design, setup, layout, and <br />deliverables coordination, he maintains all CADD workstations and related software <br />upgrades. Serving in the official title of. CADD Manager. his vast knowledge of multiple <br />platforms and application software allow him to navigate and replicate the various <br />client -specific environments. His flexibility and constant ongoing training ensures that he <br />remains current with the latest release versions of industry standard CADD applications. <br />Project Experience <br />CADD Manager -Bentley Microstation V81 SS2, Portsmouth Gaseous Diffusion Plant - <br />Decontamination & Decommissioning - On -Site Disposal Coll, Fluor- Babcock & Wilcox <br />Portsmouth, LLC under contract to the United States Department of EnorgyTitle - Served <br />in role of CADD Manager for the OSDC in Piketon, Ohio, in partnership with Fluor. <br />Established programmatic CADD design standards and created CADD manual. Ordered <br />computer hardware and design software to accommodate 5 workstations. Supervised <br />the CADD department in the creation of preliminary design clrawings and exhibits. <br />Created site layouts and grading plans and all other Civil drawings necessary for <br />implementation of selected remedy waste disposal option. Oversaw and managed the <br />direct interaction with FBP contract awarded A & E firm to maintain compliance with <br />FBP's policies and standards as it related to electronic media Submittals. Trained and <br />mentored junior CADD designers and junior engineers in the application design <br />software. Responsible for all CADD-related project issues. <br />Senior Designer -Bentley Microstation VSi SS3, Water Group Job 926, Orion <br />Construction/CityofSan Diego -Prepared plan & profile construction documents for <br />waterline replacements in the City's Point Loma area. All drawings were created per the <br />City of San Diego's CIP guidelines and Citywide CADD & Drafting Standards-2012 <br />edition. Coordinated all job set CADD & design requirements for BRADY and Orion <br />Construction. <br />Senior Designer -Bentley Microstation XM,1-6S0 Smart Lane Electronic Toll System, <br />Electronic Transaction Corporation/Alameda County Corridor Management Agency - <br />Prepai ed plan & detail construction documents for electronic toll system upgrade to <br />current HOV lane located in the Alameda County corridor limits boundary. All drawings <br />were created per CalTrans standard plans preparation manual and the electronic files <br />strictly adhere to the Caltrans CADD manual. <br />Senior Designer -Bentley Microstation XM, Water Group Job 790, Orion <br />Construction/Harris& elates/City of San Diego -Prepared plan &profile <br />construction documents for waterline replacements in the City La Jolla area. All <br />drawings were created per the City of San Diego CIP guidelines. Coordinated all job <br />set CADD & design requirements for BRADY between prime partners Orion Construction <br />and Harris & Associates. <br />RICHARD BRADY &ASSOCIATES, INC. a-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.