My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN AND ASSOCIATES, INC-A-2020-075-07
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN AND ASSOCIATES, INC-A-2020-075-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2024 12:40:08 PM
Creation date
5/6/2020 4:12:40 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN AND ASSOCIATES, INC
Contract #
A-2020-075-07
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
4/1/2025
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL FOR r w d <br />On -Call Water Resources Engineering Services <br />RFP NO.: 19-100 <br />• QC/QA Implementation: The QC/QA plan that Kimley-Horn and its team members will follow in the <br />execution of services prepared under this contract is currently being utilized successfully on our other <br />local public contracts and includes the following six key elements: <br />• Structure: Each QC/QA plan includes a project manager (responsible for the overall quality of the <br />project), technical managers (engineers responsible for discipline design development), and a QC/ <br />QA manager (responsible for verifying that the QC/QA plan is being implemented and followed). <br />• Procedures: Intra-disciplinary checking of documents will be performed by a competent individual <br />within each discipline other than the designer. We have established a color -coded comment <br />process that involves the following steps: an initial check (performed by the checker); a review of <br />comments to ensure that suggested changes to the documents are given adequate consideration <br />and the resolution is documented (performed by the designer); a review that ensures changes <br />to the documents are completed in the original documents (performed by the designer); and <br />finally, a review that ensures changes to the documents are completed accurately (performed <br />by the checker). <br />• Inter -Disciplinary Reviews: Inter -disciplinary reviews and coordination are performed throughout <br />the project and prior to key submittals, when senior staff from the various discipline groups are <br />brought together to discuss and comments on the interaction of the overall project elements. <br />• Quality Assurance Audit: The QC/QA manager will be responsible for conducting a quality <br />assurance audit after completion of the checking and review process and prior to the submittal of <br />any document or deliverable. <br />• Deliverables and Document Control: The project manager will manage the submission of design <br />documents after the QC/QA audit is complete and at milestone completion dates. <br />• Corrective Action Measures: Corrective action measures will be taken if incorrect or <br />nonconforming work is discovered in deliverable items that have already completed <br />the QC/QA process. <br />Key Factors for Successful Project Delivery <br />Strong Relationships: The Kimley-Horn team has developed relationships and trust with key decision <br />makers at Orange County Public Works, Orange County Water District, OCTA, Caltrans, utility agencies <br />and local cities which allow us to effectively communicate and build project consensus in a timely <br />manner. In addition, we have long standing working relationships with our team members, and know <br />how to work collaboratively as a team. <br />Involvement in Project Development: For successful project delivery, it is critical that scopes are <br />clearly defined to help ensure both the City and Kimley-Horn project managers have the same project <br />understanding and expectations at the start of a project. We strive to be on the same page with the <br />agency project manager regarding expectations of work included in the project scope, including <br />deliverables and schedule, before we submit our fee proposal. <br />Project Management Structure: The project manager for each project is responsible for providing <br />exceptional, proactive client service by maintaining overall control of the project delivery; managing <br />the flow of information both internal to the project team and with the agency and key stakeholders; <br />managing integration of our team members; maintaining adherence to budget and schedule; and <br />being responsible for the quality control of final deliverables. Our project managers utilize a proven <br />set of project control tools to proactively manage schedule, costs, resource needs, and minimize <br />risks. The extensive management and design experience of our project managers will ensure that the <br />Kimley-Horn team will be able to deliver the various types and sizes of projects likely to arise from this <br />on -call contract. <br />City of Santa Ana • IVVOC"0'I 119 Kimley,>)Horn . 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.