My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Craig (CJ) Ervin, is a licensed Grade 3 California Water <br />Treatment Operator who possesses over 29 years of experience <br />Arn ME in construction inspection for water reclamation plants, water and <br />::: sewer pump stations, pipelines and infrastructure for new tract <br />Mr. Craig (CJ) Ervin developments. <br />Role: Inspector Additionally, Mr. Ervin has provided claims management, cost <br />Professional Registration control, change order preparation, change order negotiation, <br />State of California Grade 3 warrantee inspections, warrantee work coordination with <br />Water Treatment Operator contractors, and constructability review services to municipal <br />American Water Works agencies. <br />Association Grade 2 • Watermain Improvements at Virginia, Oak, and Bayonne for <br />Distribution Operator the City of El Segundo — Lead Inspector- Construction consisted <br />Years of Experience: 30 of approximately 4,000 LF of 8" DIP, appurtenant valves, new fire <br />Years with AKM: 4 hydrants, fire hydrant abandonments; 108 connections to existing <br />system; re-establishment of water services; installation of new <br />service meters; hydrostatic testing of new water main; chlorination and de -chlorination of water <br />main; and final flushing. Also included was rehabilitation of concrete paving, cross gutters, <br />curb/gutter/sidewalks, and slurry seal. <br />• Watermain Improvements at Center, Walnut, and Maple for the City of El Segundo — Inspector <br />for the project which consisted of approximately 3,500 LF of 10" DIP, 850 LF of 8" DIP, 1,000 feet <br />of a temporary high -line system to serve customers while replacements were being conducted on <br />Center Street, appurtenant valves, new fire hydrants, fire hydrant abandonments; 8 connections to <br />existing system; re-establishment of water services; installation of new service meters; hydrostatic <br />testing of new water main; chlorination and de -chlorination of water main; and final flushing. Also <br />included was rehabilitation of concrete paving, cross gutters, curb/gutter/sidewalks, and a grind and <br />cap of the streets along the pipe alignment. <br />• Olive Street Water Main Replacement for the City of Anaheim - Mr. Ervin provided complete <br />inspection services for the construction of 2,100 linear feet of 16-inch ductile iron watermain. The <br />new watermain replaced an existing 8-inch main. In order to maintain water service to the <br />commercial customers the watermain served, a high -lined temporary water service was established <br />and maintained. The 9 commercial service tie-ins, which required extensive advanced coordination <br />with the commercial customers, were successfully completed in one day. <br />• 24-inch University Drive Parallel Recycled Water Pipeline and Michelson Recycled Water <br />Pipeline Replacement for the Irvine Ranch Water District — Chief Inspector for the project that <br />involved the construction of 12,000 feet of CML&C welded steel pipe extending from the Michelson <br />Reclamation Plant to a recycled water storage reservoir. The work also included 425 liner feet of a <br />jack and bore underneath the San Diego Creek Channel and a cathodic protection system. <br />• AES Sewer Design Revision 1 project for Alamitos Energy, LLC — Field Engineer responsible <br />for the preparation of plans for the design of an industrial process water fomemain across the <br />Studebaker Bridge and Lyones Bridge in the City of Long Beach. This project included approx. 400- <br />LF of 4-inch stainless steel forcemain pipe and 12-inch galvanized steel casing pipe structurally <br />supported across two bridges over the Los Cerritos Channel. This bridge crossing design was a <br />portion of a larger project encompassing a total of 2,500-LF of on -site and off -site pipeline work <br />which ultimately discharges into the City of Long Beach sewer system. <br />• Ross Avenue Sewer Improvements Project for the City of Alhambra — Construction Inspector <br />for the project which consisted of the removal and disposal of approximately 1,700 linear feet of <br />existing 20" VCP sewer; removal and disposal of five (5) existing manholes; the installation of <br />approximately 1,700 linear feet of 21" extra strength VCP sewer including the trenching, bedding, <br />and pavement resurfacing; the construction of five (5) 60" sewer manholes including the application <br />AKM Prop. 20-1004 Appendix B - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.