My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of a polyurethane coating system to the interior manhole surfaces, connecting existing sewer <br />laterals to the new sewer main; backfill and re -compaction of the sewer trench; reconnecting <br />existing sewer manhole connections; mobilization, demobilization, traffic control implementation <br />and continuous bypass pumping during the construction of the new sewer main. <br />• Forcemain Improvements for the Paseo Del Mar and Rocky Point Sewer Pump Stations — <br />Construction Inspector for the project which included two separate forcemain alignments for the <br />Rocky Point and Paseo Del Mar Sewage Pump Stations. The Rocky Point alignment included <br />2,550 lineal feet of 6-inch buried ductile iron pipe, 950 lineal feet of 8-inch PVC gravity pipe, and 75 <br />lineal feet of 6-inch PVC C900 forcemain. The Paseo Del Mar alignment included 1,950 lineal feet <br />of 6-inch ductile iron pipe. The project also included the construction of four (4) manholes, recoating <br />of four (4) existing manholes with an epoxy/polyurethane coating, significant traffic control, repaving <br />of the effected streets, slurry sealing of the streets from curb to curb, and utility coordination. <br />• Various Projects throughout Orange County for the Irvine Ranch Water District - Provided <br />inspection services in Irvine for high-rise and apartment complexes and other residential <br />developments in addition to capital projects. <br />• Tustin Ranch Development Sewer Improvements for the Irvine Ranch Water District — Lead <br />Resident Engineer during the construction of all sewer lines for a new development in the City of <br />Tustin. The lines ranged in size from 18-inch through 36-inch VCP sewer line and manholes ranged <br />in size from 48-inch through 72-inch. <br />• Marine Corp Base Tustin for the Irvine Ranch Water District - Provided inspection and <br />participated in project management for water and sewer infrastructure at Lennar Development and <br />The District shopping complex. <br />• Newport Coast Development Sewer Improvements for the Irvine Ranch Water District -Lead <br />Resident Engineer for all sewer lines for a new development in the City of Newport Beach. The <br />lines ranged in size from 8-inch to 36-inch VCP and manholes ranged in size from 48-inch to 72- <br />inch. <br />• Harvard Avenue Trunk Sewer For the Irvine Ranch Water District — Lead Inspector for the <br />project which involved the construction of a 5 mile long VCP trunk sewer ranging in pipe size from <br />24-inch to 36-inch. The project also included the installation of over seventy five (75) 72-inch <br />diameter sewer manholes, significant traffic control for portions of the work and close coordination <br />with the City of Irvine. <br />• Santa Ana Heights for the Irvine Ranch Water District - Provided inspection services for <br />redevelopment projects such as fire systems. <br />• University Lift Station Upgrade Project for the Irvine Ranch Water District - Construction <br />inspector for upgrading of an existing wet well/dry well pump station with three (3) new 1200 gpm <br />VFD operated pumps, forcemain and a bypass pumping connection, suction and discharge pipes <br />and valves, ventilation system and electrical and control system. <br />• Newport Coast Drive Lift Station for the Irvine Ranch Water District — Construction field <br />engineer for a new 27-foot deep wet well/dry well pump station with three 1,600 gpm capacity non - <br />clog pumps, odor control system, and a standby generator with an automatic transfer switch. <br />• Coastal Ridge Lift Station for the Irvine Ranch Water District —Construction field engineer for <br />a new wet well/dry well pump station with a 30-foot deep wet well, with two 60 HP 260 gpm capacity <br />non -clog pumps, 6-inch forcemain, a 150 kW standby generator, and an automatic transfer switch. <br />• Montecito Sewer Lift Station for the Irvine Ranch Water District —Construction field engineer <br />for a new slide -rail submersible lift station with a 19-foot deep wet well, two 20 HP, 120 gpm capacity <br />vortex pumps, and a 4 inch forcemain. <br />AKM Prop. 20-1004 Appendix B - 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.