My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Harnisch has ten years of experience in public works <br />infrastructure engineering and construction projects. He began his <br />career working for a successful and established construction <br />company prior to joining AKM. Mr. Harnisch has served as an on - <br />Mr. Rory Harnish, PE site Project Engineer during the construction of pipeline, pump <br />Role: Inspector station, and treatment plant projects. His experience includes CPM <br />Professional Registration scheduling; estimating including take -off quantities for concrete, <br />Registered Civil Engineer valves, mechanical equipment, formwork, pipe, pipe fitting, paving <br />California C83423; OSHA and earthwork; tendering purchase orders and subcontract <br />10 Hour Construction agreements; creating work packages with superintendents, <br />Industry Certification; foreman, and various trades; monthly progress payments, <br />Caltrans Resident construction progress meetings, change order preparation and <br />Engineering Academy change order evaluation, as -built record keeping, and assisting in <br />Education: B.S. Civil organization of project startup activities. Mr. Harnisch has gained <br />Engineering, California an invaluable depth of experience working for both a Construction <br />State Polytechnic University Contractor and now an Engineering Firm as a Resident Engineer <br />Pomona representing public project owner interests. <br />Years of Experience: 10 • Elimination of Sewer Pump Station 7 and Improvements to <br />Years with AKM: 4 Sewer Pump Station 1 for the City of El Segundo — Lead <br />Inspector — AKM was responsible for the construction management <br />and inspection of the project which consisted of diverting the flows <br />from Pump Station No.7 to Pump Station No.1, improvement to the <br />pumping and operational/emergency storage capacity at Pump <br />Station No.1, installation of a diesel powered standby pump, construction of a new forcemain, and <br />removal of Pump Station No.7 from service. The project required significant modifications to the <br />gravity sewer system to divert the flows from Pump Station No. 7. Major work elements included <br />construction of a new reinforced concrete 40,000 gallon operational/emergency storage wet well; <br />replacement of the existing pumps with new 15 HP, 1000 gpm screw centrifugal pumps; <br />replacement of 8 -inch and 10-inch discharge piping and valves in the dry well; new ventilation <br />system; installation of an above -grade, self -priming, diesel sewage pump system; 850 LF of 10- <br />inch D.I. forcemain; park grading and restoration; new pump control panel, SCADA panel; manual <br />transfer switch, and miscellaneous sewer modifications at 3 locations. <br />• P-1045 Potable Water Conveyance Pipeline, Camp Pendleton — On site Project Engineer for <br />the project which involved twenty-five miles of 26", 24", 16", and 14" HDPE electro/butt-fusion <br />pipeline from North to South Camp Pendleton. The pipeline included air vacuum/air release valve <br />station, water sampling station, and blow -off station appurtenances; five horizontal directional <br />drilling locations; three booster pump stations with seven 20-hp, 486-gpm and three 40-hp, 463- <br />gpm VFD-driven vertical turbine pumps housed by CMU-block structures; and a 3 million gal <br />prestressed concrete water reservoir. <br />Lift Station No. 3 Replacement Project for the City of Alhambra — Assistant Inspector for the <br />project which involved a new 25-foot deep submersible sewage pump station within 15-feet of an <br />existing apartment building, and abandoning the existing wet well-drywell pump station under the <br />travel lanes of the 1-10 Freeway. Participated in a constructability review included analyzing the <br />feasibility of the complex 10 phase sequencing plan as well as an evaluation of sewer bypassing <br />for each phase. <br />Chevron Forcemain for the City of El Segundo — Construction Inspector for the project which <br />involved the installation of 1704 feet of 4-inch SDR 13.5 HDPE, 28 feet of 4-inch 40 mil ceramic <br />epoxy lined class 54 ductile iron pipe, 205 feet of 4-inch SCH40 stainless steel pipe, 7 feet of 3- <br />inch SCH40 stainless steel pipe, 10 concrete pipe support pedestals with stainless steel <br />adjustable pipe roller supports, and 10 6-inch diameter steel guard posts. This project included <br />AKM Prop. 20-1004 Appendix B - 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.