Laserfiche WebLink
CONTACTINFO PETER SALGADO, PE <br />949.585.04 o@nv5.com Construction Management Support <br />sas.58s.oa77 g <br />EXPERIENCE With more than 20 years of experience, Mr. Salgado has managed and <br />20 years delivered a variety of public works projects, including street improvements, <br />EDUCATION vertical construction and tenant improvements, parks and landscaping <br />improvements, and water, sewer and storm drain improvements. Working with <br />B.S. Civil Engineering a variety of agencies, he is thoroughly familiar with local, state and federal <br />LICENSES procedures. <br />Civil Engineer (CA) <br />No. 63159 Project Experience <br />AVAILABILITY <br />20% University Drive Widening (Campus to MacArthur) <br />CITY OF IRVINE I IRVINE, CA <br />Project Manager. Mr. Salgado is currently overseeing our construction <br />management and inspection team for the University Drive Widening (from <br />Campus Avenue to MacArthur Boulevard) project, which includes parkway <br />improvements, street improvements, storm drain improvements, water <br />improvements, and landscape and irrigation for the adjacent bike trail. Our <br />services include bid management, construction management, daily inspection <br />services, and project closeout. The project consists of traffic control, unclassified <br />excavation, unclassified fill, construction of PCC curb ramps, median curb, curb <br />and gutter, sidewalk, crack sealing, uniform depth cold milling, asphalt base <br />course, asphalt concrete surface course, adjusting utility manholes and valves <br />to grade, installation of traffic signs, striping, pavement markings and raised <br />pavement markers, installation of new traffic signals, traffic signal modifications, <br />SCE coordination and installation of new streetlight infrastructure, storm drain <br />installation, landscaping, irrigation system, and water quality BMPs. <br />Placentia Avenue Rehabilitation <br />CITY OF PLACENTIA I PLACENTIA, CA <br />Construction Manager. Mr. Salgado managed the construction management, <br />inspection, labor compliance and funding oversight services for this federally <br />funded project. The project rehabilitated Placentia Avenue from Chapman <br />Avenue to Ruby Drive and included removal and replacement of asphalt, <br />improvements to curb and gutter, sidewalks, installation of new traffic loops and <br />pedestrian signaling, adjusting manholes to grade, and signing and striping. <br />Trabuco Road Street Resurfacing <br />CITY OF LAKE FOREST I LAKE FOREST, CA <br />Construction Manager. Mr. Salgado managed this 1.5-mile, federally funded <br />(ARRA) street improvement project. Scope of work included cold milling; <br />reinforcement fabric installation; asphalt overlay; construction of curb, gutter <br />and sidewalk; and removal and replacement of existing asphalt. <br />Golden Lantern Roadway Widening <br />CITY OF LAGUNA NIGUEL I LAGUNA NIGUEL, CA <br />Construction Manager. Mr. Salgado managed this 1.7-mile, $5.5M roadway <br />improvements and widening project that required extensive utility coordination <br />for the relocation and adjustment of several facilities, as well as coordination <br />N V 5 with surrounding schools to alleviate potential traffic impacts. <br />