CONTACTINFO PETER SALGADO, PE
<br />949.585.04 o@nv5.com Construction Management Support
<br />sas.58s.oa77 g
<br />EXPERIENCE With more than 20 years of experience, Mr. Salgado has managed and
<br />20 years delivered a variety of public works projects, including street improvements,
<br />EDUCATION vertical construction and tenant improvements, parks and landscaping
<br />improvements, and water, sewer and storm drain improvements. Working with
<br />B.S. Civil Engineering a variety of agencies, he is thoroughly familiar with local, state and federal
<br />LICENSES procedures.
<br />Civil Engineer (CA)
<br />No. 63159 Project Experience
<br />AVAILABILITY
<br />20% University Drive Widening (Campus to MacArthur)
<br />CITY OF IRVINE I IRVINE, CA
<br />Project Manager. Mr. Salgado is currently overseeing our construction
<br />management and inspection team for the University Drive Widening (from
<br />Campus Avenue to MacArthur Boulevard) project, which includes parkway
<br />improvements, street improvements, storm drain improvements, water
<br />improvements, and landscape and irrigation for the adjacent bike trail. Our
<br />services include bid management, construction management, daily inspection
<br />services, and project closeout. The project consists of traffic control, unclassified
<br />excavation, unclassified fill, construction of PCC curb ramps, median curb, curb
<br />and gutter, sidewalk, crack sealing, uniform depth cold milling, asphalt base
<br />course, asphalt concrete surface course, adjusting utility manholes and valves
<br />to grade, installation of traffic signs, striping, pavement markings and raised
<br />pavement markers, installation of new traffic signals, traffic signal modifications,
<br />SCE coordination and installation of new streetlight infrastructure, storm drain
<br />installation, landscaping, irrigation system, and water quality BMPs.
<br />Placentia Avenue Rehabilitation
<br />CITY OF PLACENTIA I PLACENTIA, CA
<br />Construction Manager. Mr. Salgado managed the construction management,
<br />inspection, labor compliance and funding oversight services for this federally
<br />funded project. The project rehabilitated Placentia Avenue from Chapman
<br />Avenue to Ruby Drive and included removal and replacement of asphalt,
<br />improvements to curb and gutter, sidewalks, installation of new traffic loops and
<br />pedestrian signaling, adjusting manholes to grade, and signing and striping.
<br />Trabuco Road Street Resurfacing
<br />CITY OF LAKE FOREST I LAKE FOREST, CA
<br />Construction Manager. Mr. Salgado managed this 1.5-mile, federally funded
<br />(ARRA) street improvement project. Scope of work included cold milling;
<br />reinforcement fabric installation; asphalt overlay; construction of curb, gutter
<br />and sidewalk; and removal and replacement of existing asphalt.
<br />Golden Lantern Roadway Widening
<br />CITY OF LAGUNA NIGUEL I LAGUNA NIGUEL, CA
<br />Construction Manager. Mr. Salgado managed this 1.7-mile, $5.5M roadway
<br />improvements and widening project that required extensive utility coordination
<br />for the relocation and adjustment of several facilities, as well as coordination
<br />N V 5 with surrounding schools to alleviate potential traffic impacts.