Laserfiche WebLink
4, Complete the design of projects including plans, specifications, and engineer's construction <br />cost estimate. The Consultant shall contact manufacturers and/or contractors to verify the <br />engineer's estimate prior to submitting to the City. Specifications shall be prepared in <br />Microsoft Word and an electronic copy of the final version shall be furnished to the City. The <br />City will provide the specification boiler plate to the Consultant. <br />5. If requested, all preliminary and bid sets of plans shall be plotted on bond or velum paper using <br />Microstation V8i CADD software program. All drawings shall be completed per the City of <br />Santa Ana CADD Standards and any special provisions thereof. For interim submittals, the <br />City may opt to receive only PDF versions of the plans for reviewing purposes. If so, the <br />Consultant team will provided plans and/or specifications accordingly, <br />5. All original plan sheets, the title sheet of the specifications, calculations, and reports shall be <br />signed and stamped by the Consultant's licensed professional engineer responsible/in-charge <br />of the project. <br />7. If a part of the on -call project scope, the Consultant shall provide support services during the <br />bidding and construction phases of the project, including, but not limited to: <br />a. Respond to bidder inquiries during the bidding process, including preparation of any <br />addenda. Following award of the construction contract, the Consultant shall attend the pre - <br />construction meeting. <br />b. Review and approve all submittals and shop plan drawings required supporting the <br />construction contract. The Consultant shall complete shop drawings reviews within two (2) <br />weeks of receipt. Contract Change Order reviews shall be completed within two (2) <br />working days of receipt. <br />c. Respond to written Requests for Information (RFI) to provide clarification or resolve <br />discrepancies in the contract documents. Responses shall be completed within three (3) <br />working days. <br />d. Provide periodic field reviews and bring to the attention' of the City of Santa Ana any <br />defects or deficiencies in the work by the construction contractor which the Consultantmay <br />observe. The Consultant shall have no authority to issue instruction on behalf of the City <br />of Santa Ana, or to deputize another to do so. <br />8. If included in the on -call project scope, upon completion of construction, the Consultant shall <br />prepare as -built plans and submit them to the City. The Consultant shall incorporate all <br />changes to the plans electronically with all necessary revision notations. Once plans have been <br />updated, a signed set of as -built plans shall be submitted to the City with an electronic copy <br />(in Microstation V8i CADD and pdf formats) of the final as -built drawings via CD or e-mail. <br />9. The Consultant shall monitor the project progress, maintain project files, and control the <br />quality of the work performed by in-house staff and/or sub -consultants. Incomplete (not <br />meeting targeted completion) or poor quality work will not be accepted. The Consultant shall <br />revise the documents within a revised schedule set by the City, which may require overtime. <br />No additional compensation necessary for the consultant to complete this work to the <br />satisfaction of the City shall be approved by the City for the required revisions. It is the <br />responsibility of the Consultant to produce a professional -level quality of work product, <br />10. If included in the on -call project scope, attend meetings with the City staff as required. <br />11. If included in the on -call project scope, the Consultant shall coordinate plan check, design <br />topics, permits and any other issues with the City, other Agencies, and all utility companies as <br />required. At the direction of the City, the Consultant shall be the liaison with affected agencies. <br />lAll RIA! !!!! <br />City of Santa Ana RFP 19-100 m <br />Page Al-4 <br />