Laserfiche WebLink
TEAM RESUMES <br />Years of experience <br />20 <br />Education <br />BS, Civil Engineering <br />Registrations <br />PE #C65388, CA <br />QSD/QSP #20600 <br />CASQA <br />Value to the City <br />• Experience <br />managing 50+ <br />storm drain <br />rehabilitation <br />projects <br />• Managed storm <br />drain tasks for 20 <br />on -call contracts <br />• Certified SWPPP <br />developer and <br />practitioner <br />ROGER CHUNG PE, CFM, QSP/QSD, F.ASCE <br />PROJECT MANAGER, STORM DRAIN (PRIMARY CONTACT) <br />Roger's in-depth experience spans 20 years and includes more than 50 storm <br />drain projects and successful management of more than 50 on -call contracts. His <br />engineering expertise is focused in hydrology, hydraulic, and structural analysis <br />for the preparation of drainage studies, drainage master plans and preparation of <br />design plans, specifications, and cost estimates for water supply and flood <br />control facilities. He has managed projects involving hydraulic analysis and <br />design of numerous water recharge and flood control projects in Los Angeles, <br />San Bernardino, Riverside, Orange, San Diego, Kern, and Ventura counties. <br />SELECT PROJECT EXPERIENCE <br />Newland Street Channel Drainage <br />Improvements // Orange County, CA <br />(Drainage Task Leader) <br />Roger managed the plans, <br />specifications, and estimates for <br />drainage improvements. The project <br />designed the channel improvement <br />design for reconstruction of the center <br />median and the No. 1 traffic lanes in <br />each direction, and an RCB drainage <br />structure through a major signalized <br />intersection. <br />Via Ballena Storm Drain Relocation <br />// San Clemente, CA (Project Manager) <br />Roger led engineering design services <br />to eliminate stormwater discharges to <br />the damaged slopes located along the <br />back side of northerly Via Ballena <br />residences. Services included survey <br />and mapping, utility coordination, <br />hydrology and hydraulic analysis, <br />preparation of a preliminary design <br />report, preparation of final PS&E for <br />the preferred design alternative, bid <br />and construction support, and record <br />drawing preparation. <br />Citywide Storm Drain Rehabilitation <br />and Lining Project // Laguna Beach, <br />CA (Project Manager) <br />Roger investigated all corrugated steel <br />pipes located within the City, evaluated <br />their present condition, developed a <br />replacement and repair program for <br />the rehabilitation of these facilities and <br />prepared improvement plans, <br />specifications, and estimates for each <br />pipeline. Local hydrology studies were <br />performed in accordance with the <br />Orange County Local Drainage Manual <br />to determine adequacy of lines <br />identified for replacement. <br />Jamboree Road and 1-5 Interchange <br />Widening // Irvine and Tustin, CA <br />(Task Leader) <br />Roger was responsible for hydrology <br />and drainage studies, pump facility <br />modification plans, storm drain <br />plans, water quality management <br />plans, and storm water pollution <br />prevention plans for the widening <br />improvements along Jamboree Road <br />at 1-5 Freeway. <br />Fullerton Road Grade Separation 11 <br />Industry, CA (Task Leader) <br />Roger prepared plans, reports and <br />supporting technical studies for the <br />storm drain and water quality portions <br />of this $140 million grade separation <br />project that lowers Fullerton Road <br />under the existing Union Pacific <br />Railroad tracks. Plans included a <br />six -lane roadway underpass on <br />Fullerton Road with retaining walls and <br />a railroad bridge. <br />Additional Relevant Experience <br />• Tustin Avenue and Rose Drive <br />Grade Separation Project, Orange <br />County, CA <br />• Westminster Channel Conditional <br />Letter of Map Revision (CLOMR) <br />Acquisition, Westminster, CA <br />® Stantec City of Santa Ana Prouosal for Or -mall NIT -1 Resojrces Frgireenrg Sernces RFP No 19-I gn 4 <br />