Laserfiche WebLink
Years of experience <br />26 <br />Education <br />BS, Civil Engineering <br />Registrations <br />PE #58455, CA <br />Value to the City <br />• Managed design <br />of more than <br />350,000 linear <br />feet of pipeline <br />• Experienced in <br />design of a range <br />of sewer mains <br />• Nearly 20 years <br />of experience <br />working with <br />same key team <br />members <br />JEFF DUNN PE <br />PROJECT MANAGER, WATER AND SANITARY SEWER <br />For more than 26 years, Jeff has specialized in sanitary sewer and water <br />resource planning and engineering of domestic water, reclaimed water, and <br />sewer facilities. His experience includes more than 24 facility master planning <br />projects, and well as 30 hydraulic studies, for developments as large as 35,000 <br />acres, and more than 12,000 residential dwelling units. He has designed more <br />than 2,700 pipe networks and managed more than 350,000 linear feet of pipeline <br />design. Jeff has performed sewer capacity evaluations and designs of sewer <br />mains up to 30-inch diameters for various pipe materials. His experience <br />includes pump station analysis and design, pressure -reducing stations, reservoir <br />storage analysis, and construction support services. <br />SELECT PROJECT EXPERIENCE <br />Inland Empire Utilities Agency <br />Recycled Water Program Strategy 11 <br />Inland Empire, CA (Project Manager) <br />Jeff managed the regional recycled <br />water program strategy for IEUA which <br />included an evaluation of the supplies <br />and demands for identification of <br />capital improvement needs for their <br />10-year CIP to follow the region's <br />changes in water resource priorities. <br />Non -Reclaimable Water System and <br />System -Wide Sewer Hydraulic <br />Evaluations 11 Ontario, CA <br />(Project Manager) <br />Jeff performed engineering and <br />hydraulic analysis services for the <br />Inland Empire Utility Agency's <br />replacement of their deteriorated <br />manholes at various locations <br />throughout the existing sewer <br />collection system. <br />Planning Area 61 Sub -Area Master <br />Plan Update Reach A and Marine <br />Way Sewer Alternatives Analysis I/ <br />Irvine, CA (Project Manager) <br />Jeff managed the evaluation of existing <br />collection system and alternatives for <br />improvements for Reach A and Marine <br />Way sewer collection systems. Stantec <br />evaluated an existing 12-inch sewer, <br />approximately 5,000 linear feet, <br />including the railroad crossing and <br />sewer crossing 1-5. System analyses <br />included various flow re-routing <br />alternatives and upsizing of the <br />existing sewer for interim and ultimate <br />flows. Stantec also investigated <br />alternatives and flow analyses for <br />various development conditions for the <br />Marine Way 18-inch sewer, which was <br />approximately 3,500 linear feet. <br />Preliminary Design Report and Final <br />Design for Lift Station No. 6 Force <br />Main Replacement and Sewer <br />Analysis it Dana Point, CA <br />(Project Engineer) <br />Jeff performed a sewer hydraulic <br />analysis and evaluation of force main <br />replacement alternatives. Stantec <br />studied four alternatives for a new <br />pipeline alignment, analyzed existing <br />flows and determined pipe sizing, led <br />community meetings with homeowners <br />associations and stakeholders, and <br />completed the preliminary design <br />report. Stantec was retained to prepare <br />the final design plans and <br />specifications. <br />Additional Relevant Experience <br />• Preliminary Design Report and <br />Final Design for Lift Station No. <br />6 Force Main Replacement and <br />Sewer Analysis, Dana Point, CA <br />• State Street Sewer Upgrades <br />Preliminary Design Report and <br />Alternatives Analysis, Santa <br />Barbara, CA <br />(3 Stantec City of Santa Ana Proposal for Or -Call At—, Re;ai -es Ergireenng Seiaices RP No_ 14 I 'i 5 <br />