My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC CONSULTING SERVICES, INC-2020-075-04
Clerk
>
Contracts / Agreements
>
S
>
STANTEC CONSULTING SERVICES, INC-2020-075-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:23:45 AM
Creation date
5/6/2020 4:27:42 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC CONSULTING SERVICES, INC
Contract #
A-2020-075-04
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2024
Destruction Year
2024
Notes
For Insurance Exp. Date see Notice of Compliance
Document Relationships
STANTEC CONSULTING SERVICES. INC.
(Amended By)
Path:
\Contracts / Agreements\S
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
duration, day or night time requirements, bypass <br />pumping requirements, and construction costs. <br />Alternatives analysis workshop will be held to <br />discuss the evaluation matrix and proposed <br />recommendations. A PowerPoint presentation <br />will be prepared that shows each alternative, the <br />pros and cons for each, and estimated project <br />costs. <br />We will obtain input from the City in this manner <br />so as to recommend the appropriate project. <br />Prior to finalizing the recommendation, we will <br />obtain the geotechnical investigation report, <br />potholing data, and all utility data to determine <br />feasibility of the proposed recommendation. <br />1.6 Subsurface Utility Engineering Services <br />As part of the preliminary alignment and <br />alternatives analysis, some potholing may be <br />preferred to take place during the preliminary <br />design phase of the project. Cardno will perform <br />the subsurface utility engineering services for all <br />known utilities crossings and potential conflict <br />areas with other projects. Potholing will locate <br />active and abandoned utilities within the project <br />site. Potholes will also identify the existing <br />pavement section (thickness of asphalt concrete, <br />Portland cement concrete, asphalt base, native, <br />etc.). <br />1.7 Identify Permits and Stakeholder <br />Coordination <br />We will identify and coordinate utility work with <br />the City and all impacted agencies prior to <br />developing the final alignment for the selected <br />sanitary sewer improvements. We will identify <br />the all impacted stakeholders in relation to <br />construction of the proposed project, scheduling, <br />costs, and permits necessary for any <br />reconstruction/relocation of existing utilities and/ <br />or permits. <br />1.8 Prepare Preliminary Design Report <br />We will prepare a preliminary design report for <br />the City's review and comment. The report will <br />contain the necessary information to establish <br />the project to be designed and constructed. The <br />final design will be based on the conclusions and <br />recommendations in the preliminary design <br />report. <br />2 — Final Design <br />2.1 50% Complete Plans, Specifications, and <br />Estimates <br />The 50-percent submittal will include horizontal <br />and vertical alignments with pertinent information <br />to verify accuracy of design. The construction <br />plans will be prepared for 24" x 36" size sheets, <br />with the City's standard title block format; <br />construction plans will include general notes, <br />construction notes and details as necessary. <br />Plan and Profile of proposed pipelines will not <br />exceed 500 feet per sheet (with a scale of 1 <br />inch=20 feet horizontal and 1 inch=4 feet <br />vertical). <br />2.2 90% Complete Plans, Specifications, and <br />Estimates <br />We will prepare 90-percent completed <br />construction plans based on the review <br />comments and preliminary design plans. The <br />90-percent construction plans will include the <br />entire plan set, including the title sheet, general <br />notes sheet, plan and profile sheets, and detail <br />sheet(s). All of the necessary construction notes, <br />details, and quantities will be shown on the <br />90-percent plans. <br />The final design will conform to all requirements <br />of Federal, State, and Local codes, ordinances, <br />and regulations, and carry out the concepts <br />agreed upon in the Preliminary Engineering task. <br />Contract specifications in the City's format <br />will also be prepared for the bid package. The <br />specifications will include but not limited to any <br />special provisions, technical specifications, <br />and an itemized cost estimate of the proposed <br />improvements. <br />For the 90-percent submittal, we will provide <br />full-size sets and half-size sets of 90-percent <br />complete plans, sets of specifications, and cost <br />estimate for each bid package. We will provide <br />one (1) soft copy of plans in AutoCAD and pdf <br />formats; one (1) soft copy of specifications in <br />Microsoft Word and pdf, and one (1) soft copy of <br />cost estimate. We will provide one copy of bid <br />schedule in Microsoft Excel and pdf formats. <br />(� Stantee City of Santa Ana I Proposal for On -Call Water Resources Engineering Services RFP No. 19-100 Scope of Services and Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.