My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AS -NEEDED CONSTRUCTION INSPECTION <br />SERVICES <br />IRVINE RANCH WATER DISTRICT I IRVINE, CA <br />Our team currently provides the Irvine Ranch Water District <br />with as -needed design and construction inspection services. <br />Currently, we are providing two full-time construction <br />inspectors responsible for performing inspections on capital <br />and subdivision construction projects, including sewer, water <br />and recycled water pipelines; pumping stations; pressure - <br />reducing stations; sewage lift stations; treatment plants; <br />reservoirs; and other facilities. Additionally, we are providing <br />full design services on a per project basis for all types of water, <br />recycled water and wastewater capital improvements. <br />DATES: FEBRUARY 2015-CURRENT <br />REFERENCE: BELLY LEW. ENGINEERING MANAGER. 949,453.5586 <br />ARANTINE HILLS SEWER AND WATER <br />INFRASTRUCTURE <br />CITY OF CORONA I CORONA, CA <br />Our team provided construction management and inspection <br />services for the $14.7M three-phase Arantine Hills sewer <br />and water improvement projects to provide the necessary <br />infrastructure for the Arantine Hills Development Project. <br />A major rerouting of the City's water distribution system for <br />nearly a mile, including service connections, was part of this <br />project. The project involved the construction of a buried cast - <br />in -place sewer lift station with above -grade controls. This was <br />connected to a second project to construct the sewer force <br />main. <br />DATES: AUGUST 2017-FEBRUARY 2019 <br />REFERENCE: VERNON WEISMAN. DISTRICT ENGINEER. 951.739.4912 <br />LONG BEACH WATER DEPARTMENT <br />EMERGENCY PROJECT <br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA <br />Our team provided Construction Management and Inspection <br />Services for the completion of an emergency project for <br />the Long Beach Water Department. The project provided <br />LBWD a connection to the Los Angeles County Sanitation <br />District's (LACSD) reclaimed water pipeline. Work involved <br />construction of additional 25-foot-deep shoring within 5 feet <br />of the operational LACSD operational plant. Managing high <br />groundwater along with keeping the existing plant operational <br />during construction were just a few of the important <br />construction missions to be accomplished. <br />DATES: DECEMBER 2018-APRIL 2019 <br />REFERENCE: ABELARDO RENDON, MANAGER OF ENGINEERING. 562.570,2341 <br />
The URL can be used to link to this page
Your browser does not support the video tag.