My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER LINE REPLACEMENT <br />CITY OF MANHATTAN BEACH I MANHATTAN BEACH, CA <br />Our team provided construction management and inspection <br />services for the citywide replacement of old and/or undersized <br />water mains and associated valves to reduce the risk of main <br />breaks and enhance fire suppression flows. New 6-inch ductile <br />iron pipes replaced a total of 10,261 LF of existing water <br />mains. Work also included the installation of five new fire <br />hydrants, reconnection of four existing fire hydrants and the <br />installation of 2-inch water blow -off assemblies at four sewer <br />pump stations. The project also included trench restoration, <br />roadway resurfacing and reconstruction, and traffic signage <br />and striping. <br />DATES: SEPTEMBER 2015-APRIL 2016 <br />REFERENCE: PREiNI KUMAR. CITY ENGINEER. 310.802.5352 <br />DIVERSION PIPELINE <br />CITY OF CULVER CITY I CULVER CITY, CA <br />Our team is currently providing construction management <br />and inspection services for the construction of diversion <br />sewer pipes to abandon Mesmer and Overland Sewer Pump <br />Stations. The goal of the project is to divert flows from four of <br />the City's sewer pump stations to a new sewage pump station, <br />Bankfield Station, which is another project for which NV5 is <br />providing construction management and inspection services <br />during construction. <br />DATES: MARCH 2019-CURRENT <br />REFERENCE: HONG WANG. SENIOR CIVIL ENGINEER. 310,253.5604 <br />SGVMWD INTERCONNECT AND SITE <br />IMPROVEMENTS <br />AZUSA LIGHT & WATER I AZUSA, CA <br />NV5 provided construction inspection services for this pipeline <br />interconnection project. The new interconnection pipeline and <br />site improvements were constructed near the Hsu -Canyon <br />Water Treatment Plant at North San Gabriel Avenue (Highway <br />39) and Ranch Road, north of Sierra Madre Avenue. <br />DATES: MAY 2018 OCTOBER 2018 <br />REFERENCE: AMMAR TOHMEH. WATER ENGINEERING ASSOCIATE. 626.812.5063 <br />
The URL can be used to link to this page
Your browser does not support the video tag.