My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC - A-2020-076-01
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC - A-2020-076-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 4:24:04 PM
Creation date
5/6/2020 4:28:46 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-076-01
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEWER REHABILITATION <br />CITY OF VILLA PARK I VILLA PARK, CA <br />Our team provided Construction Management and Inspection <br />services for the FY 17-18 Sewer Rehabilitation Project. The <br />project included removal and replacement of selected sections <br />of 8-inch VCP sewer; spot repairs; CIPP relining; installation of <br />a 48-inch sewer manhole; removing and replacing an existing <br />sewer cleanout; reconnecting an existing sewer lateral; <br />restoration of curb, landscaping and irrigation, traffic striping <br />and markings; and installing a sewer bypass pumping system. <br />DATES: AUGUST 2018-DECEMBER 2018 <br />REFERENCE: STEVE FRANKS. CITY MANAGER. 714.998.1500 <br />COMPTON BOULEVARD AND WILMINGTON <br />AVENUE SEWER REPLACEMENTS <br />CITY OF COMPTON I COMPTON, CA <br />Our team provided construction management and inspection <br />services for this sewer rehabilitation project. The project <br />consisted of a combined total of 5,700 LF of new construction <br />of 10-inch, 12-inch and 15-inch VCP sewer main lines; new <br />construction of 10-inch, 12-inch and 16-inch Ductile Iron sewer <br />main lines; in -place reconnection for 60 service laterals; the <br />restoration of the appurtenances associated with the sewer main <br />construction; constructing 30 new sewer manholes; reconstruct <br />two existing sewer main line connections to Los Angeles County__ , <br />Sanitation District sewer trunk main; and other associated work. <br />DATES: JUNE 2016-MARCH 2O17 <br />REFERENCE: JOHN STRICKLAND, PROJECT MANAGER. 310.605.5505 <br />REDUNDANT DISTRIBUTION SYSTEM <br />MONITORING, RESERVOIR 1 & 2 PUMP STATIONS <br />MESA WATER DISTRICT <br />NV5 is providing construction management and inspection <br />services for the Redundant System Monitoring at Reservoir 1 <br />and Reservoir 2 Pump Stations. The new system is designed <br />to provide better level monitoring and SCADA control at the <br />two reservoirs. The two reservoirs work together and operate <br />on a single -pressure zone. The project involves tapping <br />each of the 36-inch CMLC pipelines in the pump room of the <br />reservoirs and installing a total of about 200 feet of conduit. <br />These will enable the replacement of the existing pressure <br />instrument with a new pressure -indicating transmitter. <br />DATES: JULY 2018-JUNE 2019 <br />REFERENCE: KARYN IGAR. SENIOR CIVIL ENGINEER, 949.207.5452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.