Laserfiche WebLink
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS w <br />MAY 2020 (9TH STREET TO 16TH STREET) PROJECT <br />J" <br />SANTA ANA. CALIFORNIA <br />Approximately 48,000 students are enrolled in SAUSD schools.56 SAUSD serves transitional - <br />kindergarten through 12th-grade children with 48 preschools and elementary schools, 10 <br />intermediate schools, 8 high schools, 2 special -education schools, 1 adult education school, and 1 <br />career technical education school.57 Approximately 43,300 students are enrolled in GGUSD <br />schools.58 The closest schools to the Project site include the REACH Academy Community Day <br />Intermediate and High School located adjacent to the southern border of the Project site. <br />Library services are provided at the Santa Ana Public Library, Newhope Library Learning Center, <br />Garfield Community Center, Roosevelt -Walker Community Center, and Jerome Community Center.59 <br />The closest library services to the Project site are provided at the Jerome Community Center, <br />located approximately 1.5 mi south of the Project site. <br />Parks and recreational facilities in the vicinity of the Project area include the SART and Fairview <br />Triangle, a trailside rest area with native plant restoration, seating, and interpretive signage. <br />3.15.2 Impact Analysis <br />a. Would the project result in substantial adverse physical impacts associated with the provision <br />of new or physically altered governmental facilities, need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental impacts, <br />in order to maintain acceptable service ratios, response times or other performance objectives <br />for any of the public services: <br />Fire protection? <br />Less Than Significant with Mitigation Incorporated. The proposed Project would not result in <br />any new land uses that would require fire protection. Fairview Street is currently used by the <br />OCFA to access land uses in this part of Santa Ana. The proposed Project would reduce <br />congestion along Fairview Street. No long-term road closures and no closures during peak travel <br />hours are anticipated through the Project area during construction of the proposed <br />improvements, and at least one through -traffic lane in each direction would be kept open at all <br />times. However, construction activities may temporarily restrict local vehicular traffic, which <br />could affect emergency response or evacuation. A TMP is needed to ensure that adequate <br />emergency response and evacuation will be maintained. Mitigation Measure TR-1, provided <br />later in Section 3.17, Transportation, requires that a TMP be developed during final design to <br />address impacts to local circulation during construction, including emergency access. The TMP <br />would require that emergency service providers be notified prior to Project construction <br />regarding any temporary limitations to emergency access. Therefore, with implementation of <br />56 Santa Ana Unified School District. 2019. District Overview. July 11. Website: https://www.sausd.us/ <br />domain/3 (accessed August 2019). <br />57 Garden Grove Unified School District. 2019. Which School Will My Child Attend? Website: <br />https://www.ggusd.us/schools/#elementary (accessed August 2019). <br />58 Ibid. <br />59 City of Santa Ana. 2019a. Library Services. Website: https://www.santa-ana.org/library (accessed August <br />2019). <br />R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) 3-89 <br />