My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L w FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />J' (9TH STREET TO 16TH STREET) PROJECT <br />MAY 2020 <br />SANTA ANAL CALIFORNIA <br />16th Street. Currently, the Fairview Street bridge is utilized by bicyclists and pedestrians to cross <br />over the Santa Ana River, but there are no existing sidewalks or bikeways on the bridge. As part of <br />the proposed Project, the Fairview Street bridge would be replaced with a new six -lane bridge (three <br />lanes in each direction), including a complete bridge deck with barrier rails, sidewalks, bicycle lanes, <br />a raised median, and lighting. These features would improve the safety of the area for both <br />motorized and nonmotorized travel. The improved bridge may attract additional pedestrians and <br />bicyclists due to added sidewalks and bikeways, which could facilitate access to the park by <br />nonmotorized travel; however the Project does not include recreational facilities or require the <br />construction or expansion of recreational facilities because it involves bridge replacement, roadway <br />widening, and restriping. Impacts would be less than significant, and no mitigation is required. <br />3_92 R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.