My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INITIAL STUDY/MITIGATED NEGATIVE DECLARATION FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS A <br />MAY 2020 (9TH STREET TO 16TH STREET) PROJECT <br />J" <br />SANTA ANA. CALIFORNIA <br />• Advance notice to the public and local emergency service <br />providers regarding the timing, location, and duration of <br />construction activities. <br />• Procedures for coordination with OC Parks to ensure <br />appropriate bicycle/pedestrian detour routes and ensure <br />appropriate signage is provided to display the dates of the <br />closures and to identify the detour routes <br />Procedures for coordination with emergency service providers <br />to minimize temporary delays in emergency response times. <br />Such coordination could include the identification of alternative <br />routes for emergency vehicles and routes across the <br />construction area. <br />Mitigation Measure TR-2 Fairview Street/Civic Center Drive Intersection LOS Monitoring. As <br />part of the City's annual review of its Capital Improvement Program, <br />the City Traffic Engineer will evaluate the function of the <br />intersection of Fairview Street and Civic Center Drive to ensure that <br />it operates at adequate level of service (LOS). If LOS is deficient, the <br />City will restripe the westbound shared left -through turn lane to a <br />shared left -through -right turn lane. <br />R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) 3-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.