Laserfiche WebLink
L w FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />`J' (JTH STREET TO 16TH STREET) PROJECT <br />MAY 2020 <br />SANTA ANAL CALIFORNIA <br />Mitigation Measure UTL-2 Updated Utility Survey. During the design phase, the Project <br />Engineer will provide the City of Santa Ana (City) Director of Public <br />Works, or designee, with an updated utility survey to update <br />information on known utility facilities as well as previously <br />unidentified/unknown or new utility facilities within the disturbance <br />limits. <br />3-110 R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) <br />