My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSE TO COMMENTS FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS (9TH STREET TO 16TH STREET) PROJECT C <br />MAY 2020 CITY OF SANTA ANA, CALIFORNIA J <br />Table A.1: Response to Comments <br />Respondent <br />Comment <br />Comment <br />Response <br />Number <br />Design Manual. Submitted reports should contain the <br />necessary calculations and supporting files, computer <br />models, exhibits, maps, tables, and any other <br />information necessary to enable a complete review. <br />L-1-4 <br />Please revise Section 1.0 Project Information, Item #10 <br />This comment requests a revision to Section 1.0 Project <br />(page 1-13), to read: "United States Army Corps of <br />Description, Item #10 (page 1-13) to include "(Section 14 of the <br />Engineers (USACE): Compliance with the Nationwide <br />Rivers and Harbors Act of 1899, 33 USC 408)" and remove "of <br />Permit Program Under Section 404 Clean Water Act <br />the Clean Water Act". The referenced text has been revised. <br />and Section 408 (Section 14 of the Rivers and Harbors <br />See Chapter 4.0 (Corrections and Additions) of this document. <br />Act of 1899, 33 USC 408)." <br />L-1-5 <br />If you have any questions regarding these comments, <br />This comment in conclusory and provides contact information <br />please contact Alison Camara at (714) 647-3961 in <br />for future correspondence. <br />OC Flood Programs or Steven Giang at (714) 667-8816 <br />in OC Development Services. <br />The comment does not contain any substantive statements or <br />questions about the environmental analysis or conclusions <br />contained in the IS/MND or the analysis therein. Therefore, no <br />further response is necessary. <br />UTILITIES <br />U-1 <br />U-1-1 <br />This response is for "AT&T—TCA" only. Name change <br />This comment is introductory and introduces ensuing <br />Maria Guzman <br />from TCG (Teleport Communications Group) to TCA <br />comments. <br />AT&T Transmission TCA <br />(Teleport Communications America, LLC) - Effective <br />420 S. Grand Ave, Room <br />date of the merger is January 1, 2013 <br />The comment does not contain any substantive statements or <br />707 <br />questions about the environmental analysis or conclusions <br />Los Angeles, CA 90071 <br />contained in the IS/MND or the analysis therein. Therefore, no <br />May 7, 2020 <br />further response is necessary. <br />U-1-2 <br />There are no aerial or underground fiber facilities <br />This comment states that there are no AT&T-TCA facilities <br />owned by AT&T-TCA within the project location. <br />within the Project location. The comment provided does <br />not comment on the environmental analysis or conclusions <br />contained in the IS/MND or the analysis therein. Therefore, no <br />further response is necessary. <br />R:\WKE1702\ISMND\Final ISMND\Appendix G Fairview St Bridge Response to Comments.docx (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.