My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 16 20 PWA_02_02 Exh2 - IS-MND
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
06 16 20 PWA_02_02 Exh2 - IS-MND
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:31:53 AM
Creation date
6/16/2020 8:14:01 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L w FAIRVIEw BRIDGE REPLACEMENT AND STREET IMPROVEMENTS INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br />J' (9TH STREET TO 16TH STREET) PROJECT <br />MAY 2020 <br />SANTA ANAL CALIFORNIA <br />conservation planning actions are conducted at a regional level, and because the Project's total <br />impact on regional energy supplies would be minor, the proposed Project would not conflict with <br />California's energy conservation plans as described in the CEC's 2019 Integrated Energy Policy <br />Report. Further, the proposed Project includes pedestrian and bicycle safety improvements to <br />promote the use of alternative modes of transportation, which allow for a decreased dependence <br />on nonrenewable energy resources and a reduction in energy use. Thus, as shown above, the <br />proposed Project would avoid or reduce the inefficient, wasteful, and unnecessary consumption of <br />energy and not result in any irreversible or irretrievable commitments of energy. Impacts would be <br />less than significant. No mitigation is required. <br />3-36 R:\WKE1702\ISMND\Final ISMND\Fairview Street Bridge Final ISMND.docx (05/26/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.