Laserfiche WebLink
ARCHAEOLOGICAL SURVEY REPORT FAIRVIEW STREET IMPROVEMENTS FROM 9TH STREET TO 16TH STREET AND <br />JUNE 2019 BRIDGE REPLACEMENT PROJECT <br />SANTA ANA, CALIFORNIA <br />entire APE is disturbed in some manner, either covered with asphalt, concrete, or structures. Buried <br />utilities under the roadway have also added to the disturbance. The existing bridge over the Santa <br />Ana River contains bridge footings that disturbed a large area on both the north and south sides of <br />the river. Trails run the north and south sides of the river, and the south side, especially, is highly <br />disturbed from trail construction. In all, the APE exhibits a high degree of disturbance and it is <br />unlikely to contain any intact archaeological material or deposits. <br />Q:\WKE1702\Cultural\ASR\ASR 2019 OS-21.docx (06/03/19) 21 <br />