My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Appendix A Historic Property Survey Report
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
06/16/2020
>
75B - FAIRVIEW BRIDGE PROJECT CD
>
Appendix A Historic Property Survey Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 8:34:09 AM
Creation date
6/16/2020 8:15:43 AM
Metadata
Fields
Template:
City Clerk
Date
6/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCHAEOLOGICAL SURVEY REPORT FAIRVIEW STREET IMPROVEMENTS FROM 9TH STREET TO 16TH STREET AND <br />JUNE 2019 BRIDGE REPLACEMENT PROJECT <br />SANTA ANA, CALIFORNIA <br />STUDY FINDINGS AND CONCLUSIONS <br />A single fragment of Chione californiensis was found in the APE in an undeveloped area on the west <br />side of Fairview Street just south of the Santa Ana River. No other cultural resources were found in <br />the vicinity, thus the resource is an isolated find. Isolated finds are not considered <br />important/significant under Section 106 of the National Historic Preservation Act or under the <br />California Environmental Quality Act. Furthermore, Attachment 4 of the Caltrans PA (2014), <br />identifies isolated prehistoric finds consisting of fewer than three items per 100 square meters <br />(1,076 square feet) as exempt from evaluation. As such, the isolated shell fragment found in the <br />current APE is not an important resource and requires no further evaluation. <br />No additional archaeological resources were identified within the APE through archival research, <br />Native American consultation, or the field survey. The majority of the APE consists of paved asphalt <br />and concrete sidewalk along Fairview Street from Westminster Avenue/17th Street south to Civic <br />Center Drive. A small amount of acreage also includes areas outside of the sidewalk including <br />adjacent streets, and the building, lawn, and parking lot at 1002 North Fairview Street. <br />The survey showed that all surveyable areas in the APE exhibited high levels of disturbance from <br />road and bridge construction and adjacent home construction. Buried utilities have also added to <br />the disturbance of the APE. The entire APE has been substantially altered during previous <br />construction activities. As such, the likelihood of encountering intact archaeological resources is very <br />low. <br />UNIDENTIFIED CULTURAL RESOURCES <br />If previously unidentified cultural materials are unearthed during construction, it is Caltrans' policy <br />that work be halted in that portion of the project area until a qualified archaeologist can assess the <br />significance of the find. Additional archaeological surveys will be needed if the project limits are <br />extended beyond the present survey limits. <br />Q:\WKE1702\Cu1tural\ASR\ASR 2019 OS-21.docx (06/03/19) 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.